Laserfiche WebLink
<br /> <br />2,3 Dolores/San Juan/San Miguel <br />Basin (Southwest Basin) <br /> <br />2.3.1 Procedural Accomplishments <br /> <br />The Dolores/San Juan/San Miguel Basin Roundtable has <br />decided to refer to themselves as the Southwest Basin <br />Roundtable. The Southwest Basin Roundtable meets <br />every other month, alternating between the Durango and <br />Cortez areas. Mr. Steven Harris was elected Chair of the <br />Southwest Basin Roundtable and Mr. Ken Beegles was <br />elected Vice Chair. Mr. John Porter and Ms. Jennifer <br />Russell were elected to represent the Southwest Basin <br />on the IBCC per Section 37-75-104(2) of the Act. As <br />required by Section 37-75-104(a)(I) of the Act the <br />Southwest Basin Roundtable approved bylaws and goals <br />and objectives on April 6, 2006. The Southern Ute and <br />Ute Mountain Tribes were not included when the Act set <br />up the Basin Roundtables. The Southwest Roundtable <br />agreed that these Tribes should have voting <br />representatives on the Basin Roundtable and therefore <br />two additional seats were established. Representatives <br />from the Southwest Basin participated in a caucus of the <br />Western Slope Basin Roundtables on May 18, 2006. <br /> <br />The Dolores/San Juan.San Miguel Basin Roundtable <br />engaged in significant discussion regarding SB 06-179 <br />funds and the guidelines and criteria for distributing these <br />funds. At the September 13, 2006, meeting, the <br />Southwest Basin received presentations from the <br />following proposed projects that may be eligible for SB <br />06-179 funds: <br /> <br />. Approximately $200,000 to assist in the construction <br />of an extension of pipelines for an existing rural water <br />system to a new area. The funds would be used to <br />reduce the cost per home from about $20,000 to <br />$12,000. <br /> <br />. The need for $1.8 million to construct and <br />enlargement to Gurley Dam near Norwood. <br /> <br />. Approximately $200,000 for legal expenses to form a <br />new water district to construct a rural water system in <br />southeast LaPlata County. The funds are needed for <br />the court process and a trial to fight some gas <br />companies who do not want to pay a mill levy if the <br />district is formed. <br /> <br />. Approximately $100,000 for assistance in purchasing <br />land for a new reservoir near Pagosa Springs. <br /> <br />S:\IBC Support\Report to leglsl.sfure\Section 2 flnsl.doc <br /> <br />Section 2 <br />Reports From Basin Roundtables <br />,~>:2"",:",~'l'l <br /> <br />. Approximately $100,000 to investigate additional <br />storage capacity near Jackson Lake Reservoir near <br />Mancos. <br /> <br />. Approximately $50,000 to assist in the on-going <br />Dolores River Dialogue process. <br /> <br />. Approximately $100,000 for a feasibility study to <br />investigate enlargement of Cone Reservoir near <br />Norwood. <br /> <br />. Approximately $4 million to enlarge Red Mesa <br />Reservoir in the LaPlata River drainage. <br /> <br />2.3.2 Southwest Basin Educational <br /> <br />Accomplishments <br /> <br />The Southwest Basin Roundtable received two SWSI <br />presentations delivered by Mr. Rick Brown of the CWCB. <br />The first covered overall Colorado water needs and the <br />results of SWSI. The second covered specifically water <br />supply needs for the Southwest Basin. <br /> <br />2.3.3 Southwest Basin Needs <br /> <br />Assessment Accomplishments <br /> <br />A Water Supply and Needs Report was prepared for the <br />Southwest Basin utilizing information from the SWSI <br />Report as required by Section 37-75-104(c)(II) of the Act. <br />Copies of this report were distributed at the June 15, <br />2006, meeting by Mr. Rick Brown. The water needs <br />assessment for the Southwest Basin will be a primary <br />topic of dicussion at the November 2006 meeting. <br /> <br />2.3.4 Major Water Issues in the <br /> <br />Southwest Basin <br /> <br />Based on the findings in the needs assessment, the <br />Basin Roundtables are tasked with identifing major water <br />issues in their basin and proposing projects or methods <br />to meet those needs. The major water issues in each <br />basin as identified during SWSI served as a starting point <br />for the basin roundtables to further develop and refine <br />their own list of major water issues. Some of the major <br />issues identified in the Southwest Basin during SWSI <br />are: <br /> <br />. This multiple basin area of the state is extremely <br />diverse with changing demographics. <br /> <br />. Overall water supply is available but getting sufficient <br />infrastructure and water distribution will be a key <br />challenge. <br /> <br />. The Colorado River Compact places pressure on <br />uses of the San Juan River because New Mexico's <br /> <br />2-5 <br />