My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00031 (2)
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00031 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:42:51 PM
Creation date
2/15/2007 1:46:09 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/20/2006
Description
CWCB Director's Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />:: ~( .. <br /> <br />The FL Gill LLC consists of3 owners or 3 contiguous farms under the Johnson Edwards Ditch, with a <br />combined irrigated acreage of910 acres. This project involves the construction of 4 recharge ponds, 1 <br />recharge well, pipeline construction, and water right purchases to offset the depletions from 4 irrigation . <br />wells. FL Gill H20 LLC has elected to pursue alternative financing. The project is scheduled to be de- <br />authorized at the November 2006 Board Meeting. <br /> <br />5. Supply Irrigation Ditch COlllPanv - Knoth Reservoir Dam Rehabilitation <br /> <br />Authorization: Construction Fund <br />Water Source: St. Vrain Creek <br />Terms of Loan: $1,700,000 @3.50% for 30-years <br /> <br />County: Boulder- N.E. of Lyons <br />Project Yield: 9,500 acre-feet <br />Project Type: Dam Rehabilitation <br /> <br />The Supply Irrigation Ditch Company is proposing to rehabilitate the Knoth Reservoir for use as an <br />equalizer, and for storage under a conditional decree for 542 acre-feet. The average annual volume <br />diverted now is 9,500 acre-feet, which will be increased to 10,040 acre-feet with the project <br />improvements in place. The planned improvements include, reshaping the upstream face of the dams and <br />the placement of clay, installation of a toe drain, construction of 200 foot long spillway, placement of rip <br />rap, raising the dam crest on both dams to gage height 30-ft., removal of two abandoned outlets, and the <br />repair of the existing outlet to a good working condition. The proposed improvements are being <br />designed by Smith Geotechnical, of Fort Collins, Colorado. It has been discussed that the Company may <br />sell their rights to the reservoir to Little Thompson Water District. These discussions are currently taking <br />place, which if finalized, would result in a de-authorization of the existing loan. <br /> <br />6. Town of Coal Creek- Water Rights Purchase <br /> <br />. <br /> <br />Authorization: Construction Fund <br />Water Source: Arkansas River Basin <br />Terms of Loan: $67,500 @3.75% for 30 yrs. <br /> <br />County: Fremont <br />Project Yield: 34 acre-feet <br />Project Type: Water Purchase <br /> <br />The Town of Coal Creek is located 2 miles south of the City of Florence. The Town provides water <br />service to its residents through a master metering arrangement with the City of Florence Regional Water <br />System. Coal Creek provides raw water to Florence and Florence treats the water and returns it to the <br />Town of Coal Creek for use. Coal Creek's existing water rights, dated 1884 have been out of priority <br />give the current drought conditions. In order to mitigate this situation the Town is in the process of <br />purchasing 100 shares from the Union Ditch Company, which equates to approximately 125 acre-feet of <br />which 34 acre-feet is allowable for consumptive use. Total cost ofthe water purchase is approximately <br />$75,000. The Mayor, Charles Hasting is discussing extending the loan contract at their September <br />Board Meeting. If the Town chooses not to extend the contract, the project will be de-authorized at the <br />November 2006 Board Meeting. <br /> <br />7. South Side Irrigation Company - South Side Reservoir Rehabilitation <br /> <br />Authorization: Construction Fund <br />Water Source: South Platte River <br />Terms of Loan: $360,000@3.1O% for 30 yrs. <br /> <br />County: Larimer - Near Loveland <br />Project Yield: 1,241 acre-feet <br />Project Type: Reservoir Rehabilitation <br /> <br />. <br /> <br />60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.