My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00028 (2)
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00028 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:42:47 PM
Creation date
2/15/2007 1:46:07 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/19/2006
Description
Flood Section - South Platte River Easement Request - Town of Columbine Valley
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /><' <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />- 3 - <br /> <br />. There would be improved flood control and water quality benefits; <br />. The project represents an improvement to an existing storm sewer system; <br />. There is no permanent land surface impact; <br />. This area is not suitable for future development; <br />. This area is not generally accessible by the public and is surrounded by private property; and <br />. This Project is essential to the adjacent Town storm sewer system and is necessary to make the <br />gravity flow system possible. <br /> <br />A negotiated fee of $3,500 is proposed for this easement based on Method III and factors outlined <br />above. <br /> <br />RECOMMENDATION <br />Following a review of this agenda item by the AG's Office and the CWCB, staff recommends that the <br />Board: <br />Approve the request for a temporary construction and 25-year non-exclusive easement request <br />for the Town of Columbine Valley stormwater pipeline replacement in Arapahoe County, <br />Colorado located within the CWCB right-of-way. The easement fee considered under Method <br />III (Special Use Consideration), shall include a total of $3,500 and other considerations for the <br />easement and application fee. The Board further authorizes staff to work with the Attomey <br />General's Office staff and the Town of Columbine Valley to prepare the necessary easement <br />documents and authorize the CWCB Director to enter into an agreement that executes said <br />documents. <br /> <br />Flood Protection. Water Project Planning and Financing. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.