My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00026 (2)
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00026 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:42:46 PM
Creation date
2/15/2007 1:46:06 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/19/2006
Description
CF Section - Revisions to Existing Loans - Logan Irrigation District - Prewitt Reservoir Emergency Spillway Project
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />STA TE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br /> <br /> <br />Memorandum <br /> <br />Bill Owens <br />Governor <br /> <br />Russell George <br />Executive Director <br /> <br />TO: <br /> <br />Colorado Water Conservation Board <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />Dan McAullife <br />Deputy Director <br /> <br /> <br />FROM: <br /> <br />Ti~ Feehan, P.E., pr~je~t~....~Jpr ~ <br />MIke Serlet, P.E., ChIet:-' U <br />Water Supply Planning an ' lllance <br /> <br />DATE: September 1, 2006 <br /> <br />SUBJECT: Agenda Item No. 6a, September 19-20, 2006, Board Meeting <br />Water Supply Planning and Finance - Revisions to Existing Loans <br />Logan Irrigation District - Prewitt Reservoir Emergency Spillway Project <br /> <br />INTRODUCTION <br />The Logan Irrigation District (District) is requesting an increase of$194,081 to their May 2006 <br />authorization of$306,419 for Prewitt Reservoir Emergency Spillway Construction Project. The <br />requested loan increase is based on actual construction bids received from Contractors to <br />complete the work for the District. <br /> <br />BACKGROUND <br /> <br />The District will be the contracting agencies on behalf ofthe owners of Prewitt Reservoir, who <br />are as follows: <br /> <br />Logan Irrigation District (District) <br />Illiff Irrigation District (lID) <br />Morgan Prewitt Reservoir Company (MPRC) <br /> <br />17/31 Interest (54.8%) <br />8/31 Interest (25.8%) <br />6/31 Interest (19.4%) <br /> <br />Collectively, these three owners conduct business as the Prewitt Operating Committee, through a <br />Governance Contract executed in January 2006. There are seven individual members on the <br />Committee, three from District and two each from lID and MPRC. The agreement formalized <br />their historical relationship and business procedures, and addresses each entity's financial <br />responsibility with respect to the Prewitt Reservoir. Although the Governance Contract was <br />officially entered into this year, the three owners of the Prewitt have an excellent working <br />relationship and the Prewitt Reservoir has been operating this way for over 80 years. At a joint <br />meeting of the three Boards in March 2006, it was agreed that the District would be the sponsor <br />of the project and accept all financial responsibility for the purposes of this loan, while the lID, <br />and the MPRC agreed to be cooperating entities, providing a pro-rata share of the loan payment <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.