Laserfiche WebLink
<br />GRANT APPLICATION - PART 2 <br /> <br />PROJECT DESCRIPTION <br /> <br />Under which category of water conservation measures would your project fall? (refer to <br />the Appendix in Grant Guidelines) <br /> <br />o Indoor Plumbing <br />I Public Open Space <br />o SysternlInfrastructure <br />o School Education <br /> <br />I Public Info/Education <br />o Commercial/Industrial <br />o ReuseIReclamation <br />o Other <br /> <br />o Rate Structures <br />I Landscaping <br />. Government/Public <br /> <br />Description of Project: <br /> <br />Please attach as many sheets as necessary to describe your proposed project. Please <br />answer the following questions. <br /> <br />1. Provide a summary description of your proposed project. Be sure to provide a <br />description of, the need for your project, how you would implement your project, <br />and the participants in your project. <br /> <br />The Cherry Park Hydrozoning project proposes relandscaping of the park <br />perimeter. This six-acre neighborhood park provides various recreational <br />opportunities for its residents. This park, situated within a residential <br />neighborhood, is graded to follow the rolling hills of the land. <br /> <br />Because of the terrain, the establishment of turf grass around the perimeter of the <br />park has been difficult, especially on the south facing slopes. Relandscaping these <br />areas into hydrozones or xeriscaping would accomplish several goals. The <br />primary goal in the utilization of low-water requiring plants is water conservation. <br />Additionally, the vegetative cover established would enhance the park by adding <br />color and texture to the landscape. Planning for modifications to the landscaping <br />and irrigation have begun. <br /> <br />The project will be designed by South Suburban Park and Recreation District staff <br />and constructed either by a private contractor or South Suburban crews. <br /> <br />2. Describe the methods you are proposing to use to monitor or track the change in <br />water use as a result of the project. Also briefly describe how you propose to <br />evaluate the project results and publicize the results in your area. <br /> <br />Monthly metering will monitor the water usage after project completion. <br />Following the establishment period of the hydrozone plantings, water application <br />can be decreased. The District will compare monthly usage with water bills from <br />previous years to evaluate the project's success. <br /> <br />2 <br />