Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />Mr. Charles Palmer, President <br />Pinon Mesa Ranches Community Association <br />February 10, 1997 <br /> <br />2 <br /> <br />d. A contract must be comoleted before funds can be advanced on vour loan. You will <br />be working with Jan Illian during the contracting process, which usually takes 3 to <br />6 months to complete. Jan will assist you with sample association member <br />resolutions, and other documents necessary as part of the contracting process. <br /> <br />e. You must adhere to the CWCB Design and Construction Administration Procedures. <br />Mike Serlet will work with you on the CWCB requirements concerning design and <br />bidding of the construction project. During the construction process he will make <br />field inspections, which will be the basis of the monthly pay estimates for <br />disbursements of your loan funds. <br /> <br />On behalf of the Board, I would like to thank you for applying for a Construction Fund Loan <br />from the Colorado Water Conservation Board. <br /> <br />Sincerely, <br /> <br />William P. Stanton, P.E. <br />Chief, Project Planning and Construction Section <br />Colorado Water Conservation Board <br /> <br />NS:jV5 <br /> <br />Attachment <br />Updated Memo 8bJan <br /> <br />cc (With Attachment): <br />Ms. Janice C. SheReI. Boardmember eWeB <br />Mr. Chuck Haines, Wright Water Engineers, 2490 W. 26th Ave., DCllver CO 80211 <br />cc (No Attachment): <br />eWeB Section B Staff <br />Linda Bassi. AGO <br /> <br />C:\WP51V0HN\8bJan97.1tr <br />