Laserfiche WebLink
<br />Ju25':..8 <br /> <br />1978 -1981 <br /> <br />Civil Engineer/Branch Manager <br />Wright-McLaughlin Engineers <br />Denver, Colorado <br /> <br />Designed and consttucted numerous water, sewer and drainage systems including <br />small dams, channels, recreational projects, and river improvement projects; <br />floodplain analyses and damage cos't evaluations. <br />Functioned as r:ield Engineer for water systems improvement in Yellowstone <br />National Park. <br />Branch Manager for Steamboat Springs, Colorado; engineering consultant for the <br />Mt. Werner Water and Sanitation District; representative for the district in projects <br />involving municipalities, developers, districts, etc.; handled day-to-day operations. <br /> <br />24 <br />