My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC12472
CWCB
>
Water Supply Protection
>
Backfile
>
20000-20849
>
WSPC12472
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:15:24 PM
Creation date
1/29/2007 1:24:27 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8230.400.20.B.5
Description
CO River Litigation - State-Div 4 Water Court - Gunnison RICD - Water Court Filing - Expert Reports
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
5/17/2003
Author
Gary Lacy - PE
Title
Report for the Gunnison River Whitewater Park - Gary Lacy-PE - Incomplete Copy - Gunnison RICD File I of III - 05-17-03
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />0025~7 <br /> <br />.. <br /> <br />1991-1998 <br /> <br />Boulder Greenways Coordinator <br />City of Boulder <br />Boulder, Colorado <br /> <br />Responsible for planning, coordination, management, and implementation of a <br />comprehensive, state-of-the-art greenway system designed to link virtually every major area <br />of Boulder. The award-winning project includes over forty miles of greenways, bridges and <br />underpasses, pocket parks, environmental presentation and restoration areas, and flood <br />capacity improvements. The project budget is over $1 million each year. <br /> <br />1987-1989 <br /> <br />Special Projects Manager <br />City of Boulder <br />Boulder, Colorado <br /> <br />Responsible for planning, coordinating and managing a number of City projects along with <br />providing guidance and input for the preparation of city-wide master plans, annual <br />operating and capital budgets. and determination of reconunended city policies. Worked <br />closely with the Citv Manager's office, City Attorney's office and the Parks, Planning, Open <br />Space, and Public Works Departments in a cooperative way to complete each project. <br />Received the 1988 Boulder Employee Performance Bonus Award. <br /> <br />1985 - 1989 Boulder Creek Project Coordinator <br />City of Boulder <br />Boulder, Colorado <br /> <br />Planned, coordinated, and managed $4 million stream corridor project through the Citv of <br />Boulder. This project won the 1986 Colorado Engineering Excellence Award, 1986 <br />Colorado Landsc~pe Design Award, and the 1987 Best of Boulder Awards. The project <br />has been the subject of numerous articles in national magazines and at national conferences <br />and has been viewed as a state-of-the-art model for urban creek corridor projects by many <br />U.S. cities. <br /> <br />1981 - 1982 Assistant City Engineer <br />City of Glenwood Springs <br />Glenwood Springs, Colorado <br /> <br />Responsible for handling daily emergency pro\;>lems with the city water system, organizing <br />daily activities, design of capital improvement projects, and supervision of city crews. <br /> <br />23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.