My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00543 App Letter
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00543 App Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:03:46 AM
Creation date
12/19/2006 10:56:38 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153725
Contractor Name
Windsor Reservoir and Canal Company
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
HB 95-1155
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />THE WINDSOR RESER VOIR ANI> CANAL COMPANY <br />P.O. BOX 206 <br />EATON, COLORADO 80615 <br /> <br />January 19, 2000 <br /> <br />Mr. William R, Green, P.E. <br />Colorado Water Conservation Board <br />1313 Sherman Street, Room 721 <br />Denver, CO 80203 <br /> <br />Re: Loan Request for Reservoir No.8, No.8 Annex and Elder Reservoir <br /> <br />Dear Mr. Green: <br /> <br />The Windsor Reservoir and Canal Company is formally requesting funding from The Colorado <br />Water Conservation Board for the rehabilitation of the outlets on Windsor Reservoir No.8, No, <br />8 Annex, and Elder Reservoir. For the alternatives ch.osen by the Company, we are estimating <br />a total project cost of $1,788,000, not including interest. Funding for these projects will raise the <br />level of assessments approximately $105 per share of stock. This raise in level of assessment is <br />similar to increases the Company has absorbed in recent years for other rehabilitation projects, <br /> <br />A Feasibility Study was completed on these project in 1996 and was reviewed and approved by <br />CWCB staff at that time. Revisions to the study to update the costs will be transmitted to you <br />directly by SMITH GEOTECHNICAL. <br /> <br />We request your further consideration and approval of funding for the projects. Your time and <br />effort in considering our request is greatly appreciated. If you have any questions, please feel free <br />to call our secretary-treasurer Mr. Don Engel or Mr. Duane H. Smith of SMITH <br />GEOTECHNICAL. <br /> <br />Sincerely, <br />The Windsor Reservoir and Canal Company <br /> <br />~U1f~~ <br /> <br />:_) <br />
The URL can be used to link to this page
Your browser does not support the video tag.