Laserfiche WebLink
<br />- <br /> <br />. <br /> <br />Mr. E.R. Gustafson, President <br />Windsor Canal and Res Co. <br />December 9, 1994 <br /> <br />2 <br /> <br />c, You must adhere to the CWCB construction guidelines. Please contact Mike Serlet of this <br />office (866-3441). Mike can explain our contractor bidding and bonding requirements, <br />and will make field inspections during construction, <br /> <br />On behalf of the Board, I would like to thank you for applying for a Construction Fund Loan <br />from the Colorado Water Conservation Board. <br /> <br />Sincerely, <br /> <br />w~p~ <br /> <br />William P. Stanton, P.E. <br />Chief, Planning and Construction Section <br />Colorado Water Conservation Board <br /> <br />',- <br /> <br />.NS:jvs <br /> <br />Attachme.nts: updated Memo 29l.NQV and Feasibility Study Checklist <br /> <br />cc (wi Attachments): <br />Mr. David Harrison. Member eweB <br />Mr. Duane H. Smith P.E., Smith Geotechnical <br />Chuck Lile. CWCB Director <br />Peter Evans. CWCB Deputy Director <br /> <br />cc (w/o Attachments): <br />Ian nJian, CWCB Staff <br />John Van Sciver, CWCB Staff <br />Bill Green, eWeR Staff <br />Mike Serlet, eWeR Staff <br /> <br />W:\WCIRANS\SEC _ B\29INOVJtr <br />