Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />SUMMARY OF PROPOSED PROJECT <br /> <br /> <br />. Project Sponsor: Wmdsor Reservoir and Canal Company <br /> <br />Type of Project: Agricultural <br /> <br />ProJect Name: Poudre Valley Canal and Associated Structures <br /> <br />Location: Larimer and Weld Counties (see attached map) <br /> <br />Dale of Application: August 23, 1994 <br /> <br />Dale Feasibilitv Study Received: September 1, 1995 <br /> <br />Project Description: The initial projects, scheduled in 1996 and 1999, are: (1) lining and <br />conduits to reduce seepage in two sections of the Poudre Valley Canal in the vicinity of <br />Highway 287 near Fort Collins and, (2) replacing the outlet pipeline from Cobb Lake, <br /> <br />The entire 15-year rehabilitation program includes further work at Cobb Lake as well as <br />Windsor Reservoir No.8, Annex No.8, and Elder Reservoir. <br /> <br />Estimated Project Yield: Annual loss of 10,500 acre-feet of system yield avoided (for the <br />entire rehabilitation program) <br /> <br />. Estimated Cost: $1,602,380 for initial projects in 1996 and 1999 <br /> <br />Requested Loan: Increase in authorization from $500,000 to $1,202,000 (net increase of <br />$702,000) <br /> <br />Poudre Valley Canal <br /> <br />- -b~-~~""'~" <br /> <br />. <br /> <br />