My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00396 App Letter
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00396 App Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:25:15 AM
Creation date
12/19/2006 10:10:29 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153741
Contractor Name
Vouga Reservoir Association
Contract Type
Loan
Water District
72
County
Saguache
Bill Number
SB 94-029
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />... - -'.,.." <br /> <br />Agenda Item 9p-3 <br />November 9, 1993 <br /> <br />2 <br /> <br />VOUGA RESER VOIR ASSOCIATION, FOR THE REHABILITATION OF THE <br />OUTLET SYSlEM AND CONSTRUCTION OF AN ENlARGED SPIlLWAY ON <br />THE VOUGA RESERVOIR DAM, and <br /> <br />2. TIIAT LOAN AFPROV AL BB CONTINGENT UPON THE ASSOCIATION <br />SUBMITTING A LOAN APPLICATION AND ENGINEERING COST ESTIMAlE <br />FOR THE PROJECT, and <br /> <br />3. TIIAT LOAN APPROVAL BE CONTINGENT UPON ACCEPTANCE OF <br />THE PLANS AND SPECIFICATIONS FOR THE REHABIUTATION BY THE <br />OFFICE OF THE STAlE ENGINEER, and <br /> <br />4. THAT LOAN AFPROV AL BE CONTINGENT UPON REVIEW OF THE <br />ASSOCIATION'S FINANCIAL CONDmON AND ABILITY TO PAY. <br /> <br />ACTION TAKEN BY THE CWCB BOARD <br /> <br />On November 9, 1993 the eweB Board took the following action: <br /> <br />1. Approved A CONSTRUCTION FUND LOAN IN AMOUNT OF $300,000 ( 4% <br />for 30 YEARS ) not to exceed 75% of qualifying construction costs FOR TIlE <br />VOUGA RESER VOIR ASSOCIATION, FOR THE REHABILITATION OF THE <br />OUTLET SYSlEM AND CONSTRUCTION OF AN ENlARGED SPILLWAY <br />ON TIlE VOUGA RESERVOIR DAM, and <br /> <br />2. Required THAT LOAN APPROVAL BE CONTINGENT UPON TIlE <br />ASSOCIATION SUBMITIING A. LOAN APPLICATION AND ENGINEERING <br />COST ESTIMAlE FOR TIlE PROJECT, and <br /> <br />3. Required THAT LOAN APPROVAL BE CONTINGENT UPON <br />ACCEPTANCE OF TIlE PLANS AND SPECIFICATIONS FOR TIlE <br />REHABILITATION BY THE OFFICE OF THE STAlE ENGINEER, and <br /> <br />4. Required THAT LOAN APPROVAL BE CONTINGENT UPON REVIEW OF <br />THBASSOCIATION'S FINANCIAL CONDITION AND ABILITY TO PAY, and <br />
The URL can be used to link to this page
Your browser does not support the video tag.