My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00396 App Letter
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00396 App Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:25:15 AM
Creation date
12/19/2006 10:10:29 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153741
Contractor Name
Vouga Reservoir Association
Contract Type
Loan
Water District
72
County
Saguache
Bill Number
SB 94-029
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />Agenda Item 28d. <br />November 4, 1994 <br /> <br />2 <br /> <br />Total Project Cost <br />Less Association cost-share <br />Less 1994 Authorization <br /> <br />1,087,000 <br />(337,000) <br />(350.000) <br /> <br />Additional Authorization <br /> <br />$ 400.000 <br /> <br />DISCUSSION <br /> <br />The existing $350,000 authorization is at 4 % interest, for 30 years. <br /> <br />The enlarged reservoir will have a capacity of 1010 acre feet, an increase of 100 acre feet over <br />its existing size. <br /> <br />Plans and Specifications for the project must be approved by the State Engineer. <br /> <br />A representative from Woodward-Clyde will be present at the CWCB meeting to discuss the <br />results of the feasibility study, and to answer questions. Their summary letter is attached. <br /> <br />STAFF RECOMMENDATION <br /> <br />The staff recommends: <br /> <br />1. That a $400,000 increase in loan authorization be approved for the Vouga <br />Reservoir Association for the purpose of rehabilitation of an enlargement of <br />the Vouga Reservoir Dam, and to allow the Association to refinance an <br />existii1g loan with the Wichita Bank in amount of approximately $75,000, and <br /> <br />2. That the terms for this increased authorization shall bea 5.5% annual <br />percentage rate, for a term of 30 years, and <br /> <br />3. That approval of the increased authorization shall be contingent upon <br />completion of the feasibility study now in progress, and a fmding that the <br />project is feasible, and <br /> <br />4. That the total amount loaned for the entire project by the CWCB shall <br />not exceed 75% of total project costs, and <br /> <br />5. That this approval shall be cOlItingent upon staff evaluation of the <br />Association's fmandal condition and ability to pay, and upon all standard <br />contracting provisions of the CWCB. <br />
The URL can be used to link to this page
Your browser does not support the video tag.