Laserfiche WebLink
<br />) I <br />SUMMARY OF PROPOSED PROJELl' <br />TOWN OF PALISADE <br />COTTONWOOD CREEK PIPELINE REPLACEMENT <br /> <br />Proiect Sponsor: Town of Palisade <br /> <br />Type of Proiect: Municipal water supply - raw water pipeline replacement <br /> <br />Location; About 5 miles southeast of Palisade in Mesa County on Cottonwood Creek <br /> <br />Date of Application: September I, 1994 <br /> <br />Feasibilitv Studies: WestWater Engineering of Grand Junction, November 1997 and <br />Hydrosphere Resource Consultants of Boulder, September 1997 <br /> <br />Proiect Description: The Town is proposing to replace its existing Cottonwood Creek <br />Pipeline which is the Town's major source of raw water supply. The pipeline, which was <br />built about fifty years ago, is operating at capacity and is in very poor condition. The <br />project will consist of the installation of about 4.2 miles of 12-inch diameter ductile iron <br />pipe generally following the alignment of Cottonwood Creek from the Town's main raw <br />water storage reservoir to the vicinity of the water treatment plant. <br /> <br />Estimated Proiect Yield: 1,760 acre-feet per year <br /> <br />Estimated Cost: $1,243,000 <br /> <br />Additional Authorization ReQuested; $172,000 <br /> <br />Previous Authorization: $750,000 in HB 95-1155 <br /> <br />Cottonwood Creek Pipeline Route <br /> <br />