Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />Agenda Item 18 <br />January 13, 1995 <br />Page 2 <br /> <br />RECOMMENDATION <br /> <br />The staff recommends that, at such time as the project may be authorized by the General <br />Assembly, the Board enter into a contract with the Left Hand Ditch Company for $370,000 at <br />4.375 percent interest for 30 years for the purpose of constructing the spillway modifications <br />to the Left Hand Valley Reservoir as proposed in the RMC feasibility study, <br /> <br />cc: Richard Behrman, Left Hand Ditch Co. <br />Mark McLean, Rocky Mountain Consultants <br /> <br />'. <br /> <br />w;\boardmcmyan9S\19a.jan <br /> <br />e <br /> <br />e <br /> <br />e <br />