My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153804 Approval Letter
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153804 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2011 3:26:42 PM
Creation date
12/8/2006 3:17:24 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153804
Contractor Name
Left Hand Ditch Company
Contract Type
Loan
Water District
5
County
Boulder
Bill Number
HB 95-1155
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />. <br /> <br />. <br /> <br />Agenda Item 29c <br />October 19, 1994 <br />Page 2 <br /> <br />The feasibility study developed and evaluated a number of alternative spillway configurations <br />with associated cost estimates. The selected alternative will consist of a stepped, roller- <br />compacted concrete (RCC) spillway with an RCC stilling basin. The design was selected to <br />minimize cost and the impact of the modifications to the existing dam embankment and to the <br />general area, <br /> <br />Plans and specifications for the project will require approval by the State Engineer's Office. <br />Due to a small wetlands area near the proposed stilling basin, a 404 Permit from the Corps of <br />Engineers will be required. <br /> <br />STAFF RECOMMENDATION <br /> <br />The staff recommends: <br /> <br />1. That a construction fund loan in the amount of $370,000, not to exceed 75% of actual <br />project costs, be approved for the Left Hand Ditch Company for the construction of a <br />new spillway on the Left Hand Valley Reserv~ir, and <br /> <br />2. That the financing terms ,shall be 5.5% annual percentage rate, for a repayment period <br />of 30 years, and <br /> <br />3. That loan approval shall be contingent upon a fmal staff evaluation of the Company's <br />financial condition and ability to pay, and upon all standard contracting provisions of <br />the CWCB, and <br /> <br />4. That the collateral for this loan will include the Left Hand Valley Dams and Reservoir <br />as well as a stream of revenues based upon ditch company assessments. <br /> <br />cc: Richard Behrmann, Left Hand Ditch Co. <br />Mark McLean, Rocky Moun~ Consultants <br /> <br />w:\boardm.em.\nov94\29c.nov <br />
The URL can be used to link to this page
Your browser does not support the video tag.