Laserfiche WebLink
<br />I~' <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />. <br /> <br />Town of Georgetown <br />Ms. Tammy A, Sanford <br />November 28, 1995 <br /> <br />2 <br /> <br />c, An approved contract must be in place before loan funds are made available, Jan <br />IlIian of this office (303-866-3441) wiIl be available to draft the contract after your loan <br />has received fmal recommendation in January 1996. You should call Jan as soon as <br />possible after the January meeting to discuss the contracting procedure, and to initiate the <br />contract. It usually takes about 3 to 6 months to complete contracting, No CWCB funds <br />can be disbursed until the Construction Fund Bill has been signed by the Governor and <br />your loan contact is signed by all parties, <br /> <br />On behalf of the Board, I would like to thal1k you for applying for a Construction Fund Loan <br />from the Colorado Water Conservation Board, John Van Sciver wiIl continue to work closely <br />with you through the Feasibility and fmal approval process for your loan, Please call him at any <br />time if you need assistance. <br /> <br />Sincerely, <br /> <br />1V~7?~ <br /> <br />William P. Stanton, P,E, <br />Chief, Project Planning and Construction Section <br />Colorado Water Conservation Board <br /> <br />NS:jvs <br /> <br />Attachments: <br /> <br />I. Updated Memo 18c.nov <br />2. CWCB Guidelines for Financial Assistance <br />3. Sample Feasibility Study (and Disk). <br /> <br />cc (wI Attachment 1.): <br />Mr. David L. Harrison, Chairman CWCB <br /> <br />cc (wIn Attacluncnts): <br />John Van Sciver, CWCB Staff <br />Bill Green, CWCB Staff <br />Mike Serlet, CWCB Staff <br />Jan lilian, CWCB Staff <br /> <br />C:\WPStUOHN\I8cNOV96.1tr <br />