Laserfiche WebLink
<br />Mr. Mike McNeil, President <br />Rio Grande and Piedra Valley Ditch Co. <br />September 26, 2003 <br /> <br />Page 2 <br /> <br /> <br />b) An Rpproved contract must he in plRce hefore fundll CRn he Rdvanced Jan IIlian <br />will contact you concerning our contracting procedure. It usually takes about 2.5 <br />months to complete the contract from the date the loan is approved by the CWCB. <br /> <br />c) You must adhere to the CWCR nesign ann Conlltruction Administration <br />Procedures Tim Feehan will contact you regarding the CWCB requirements <br />concerning project bidding, design, and construction. Tim will make construction <br />inspections, which will be the basis of the pay estimates for disbursement of your <br />loan funds. <br /> <br />On behalf of the Board, I would like to thank you for applying for a Small Project Loan <br />from the Colorado Water Conservation Board. <br /> <br />~JJ <br /> <br />Mike Serlet, P.E., Chief <br />Water Supply Planning and Finance Section <br />Colorado Water Conservation Board <br /> <br />Attachment: <br /> <br />Updated Memo: RGPVDC 903 memo <br /> <br />Cc (wiattachment): Mr. Ray Wright, Colorado Water Conservation Board <br />Laurie Clark, NRCS (Monte Vista) <br />CWCB Section B Staff <br />Linda Bassi, AGO <br />Chrono File <br /> <br />C:\Proj-NewlRGPVDC 903 Ltr <br /> <br />