Laserfiche WebLink
<br />Central Colorado Water Conservancy District <br />December 4, 2002 <br /> <br />Page 2 <br /> <br />b) An approved contract must be in place before funds can be advanced. Jan IlIian has <br />placed this project on our "hot list" and will initiate the loan contracting process with a <br />goal of having a signed contract in place by summer 2003. Once the contract is <br />finalized the District may request loan funds to cover eligible project expenditures. <br /> <br />c) You must adhere to the CWCS Desian and Construction Administration Procedures. <br />Tim Feehan will contact you regarding the CWCS requirements conceming project <br />bidding, design, and construction. Tim will make construction inspections, which will be <br />the basis of the monthly pay estimates for disbursement of your loan funds. <br /> <br />On behalf of the Board, I would like to thank you for applying for a loan from the Colorado <br />Water Conservation Board, <br /> <br />~J~ <br /> <br />MiKe Serlet, PE, Chief <br />Water Supply Planning and Finance Section <br />Colorado Water Conservation Soard <br /> <br />Attachments: <br /> <br />Updated Memo: CCWCD 1102 memo <br /> <br />cc(wlAttachment 1,), <br /> <br />Mr. Eric Wilkinson, Board Member, Colorado Water Conservation Board <br />CWCS Section S Staff <br />Linda Bassi, AGO <br />Chrono File <br /> <br />C, ProjeclsIProj-NewlCCWCD 1102 Ltr <br />