Laserfiche WebLink
<br />- 2- <br /> <br />c) You musl adhere to the CWCB Desi2:n and Construction Administration Procedures. <br />Tim Feehan will contact you regarding the CWCS requirements concerning project <br />bidding. design. and construction. Tim will make construction inspections. which v,'ilI <br />be the basis of the monthly pay estimates for disbursement of your loan funds. Tim's <br />phone number is 303-866-3480. <br /> <br />On behalf of the Board. I would like to thank you for applying for a Small Project Loan from the <br />Colorado Water Conservation Board. <br /> <br />Sincerely, <br /> <br />~JJ <br /> <br />~like Serler. P.E.. Chief <br />Water Supply Planning and Finance Section <br />Colorado Water Conservation Board <br /> <br />Attachment: Updated Board :vtemo <br /> <br />cc (w/Attachment): Eric Wilkinson, Board Member. Colorado Water Conservation Board <br />Duane Smith. Smith Geotechnical Engineering Consultants <br />C\VCB Section B Staff <br />Linda Bassi, AGO <br />Chrono File <br /> <br />Flood Protection. Water Prorect Planmn8 and Finanong. Stream and la!.e Prol.......tlOn <br />Water Supply ProtectIOn. ConservatIOn Planning <br />