My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12369
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSP12369
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:14:47 PM
Creation date
10/12/2006 5:34:21 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.800.10
Description
Colorado River-Colorado River Basin-Colorado River Basin General Correspondence-Lower Basin\states
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
5/20/1991
Author
USBOR
Title
Draft Regulations for Administering Entitlements to Colorado River Water in the Lower Colorado River Basin
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />in lieu of return of water. An exchange of water may not include the <br />banking of water in Federal reservoirs for later withdrawal. <br /> <br />S 415.10 <br /> <br />Reductions in entitlement due to nonuse. <br /> <br />(a) Nonuse evaluation factors. In making a determination of <br />nonuse, the Regional Director, in consultation with appropriate State <br />agencies, will consider relevant facts, circumstances, and conditions <br />that may be unique to each State, consistent with the following <br />guidelines: <br /> <br />(1) The Regional Director shall consider the unique aspects <br />of domestic and agricultural uses of water and allow consideration of <br />future growth in water demands for domestic users; <br /> <br />(2) The Regional Director will ensure that entitlements are <br />not reduced as a result of nonuse brought about by implementation of <br />documented water conservation measures; <br /> <br />(3) If the water user is able to show evidence to the <br />satisfaction of the Regional Director that there will be a need for the <br />entire entitlement within a reasonable time, the Regional Director will <br />consider additional build-up of water use schedules as a basis for <br />retaining entitlement to sufficient Colorado River water for the user's <br />growth for a period of years, based upon an average historical growth <br />rate for a like number of years, adjusted for reasonable conservation. <br />The Regional Director will consult with appropriate State agencies in <br />determining the number of years allowed for a build-up schedule and the <br />number of historical years upon which to base such projections. The <br />Regional Director, in consultation with appropriate State agencies, will <br />review this projection every 5 years and make a new determination of <br /> <br />, <br /> <br />27 <br /> <br />0855 <br />
The URL can be used to link to this page
Your browser does not support the video tag.