Laserfiche WebLink
<br />I <br />,) <br />I <br /> <br />.1 --- -') ~ <br />.L i , 1. <br /> <br />IN'I'J{OOUCTION <br /> <br />., <br /> <br />Broadcasting System. The Gene reservoir was filled and Gene <br />pumps were started on January 26, 1939. Copper Basin reservoir <br />was filled, and on March 13th Colorado River water was released <br />into Whipple Mountain tunnel. The Iron Mountain pumps began <br />operating on April 5th, those at Eagle Mountain on April 10th, and <br />Hayfield, the fifth and last lift, on July 25, 1939. First Colorado <br />River water flowed f,'om Valverde tunnel into the Cajalco basin on <br />November 2, 1939. <br />The project is now approaching the position of ability to deliver <br />water to cities within the District. It is possible to forecast quite <br />closely the cost of the initial development contemplated when bonds <br />were voted September 29, 1931. The following tabulation compares <br />the present estimate of cost with that published in July 1931, prio,' <br />to the bond election. It also gives the present estimate of cost of <br />the deferred items to complete the project to its full ultimate capa- <br />city of 1,500 cubic feet per second. <br /> <br />COLORADO RIVE!! AQUEDUCT COST ESTl~L\TF.S <br /> <br />Initial t'OIl~lrucljon (to delin'r 750 c.Ls,) <br />Dil"ersiull darn __m. ...m...... .......m.. <br />~hin 3qll~dllr:t . <br />Terminal ~lOra"~ <br />Delhery lin('~ l:" . <br /> <br />Tota] inili:l] ('II"l <br /> <br />BOI\'D ISSUE <br />ESTD1ATE <br />JULY 1931 <br />.... S 13.058.000 <br />.... 1.3.470.000 <br />mm... 17.352.000 <br />44.964.000 <br />..m.!218.8H.000 <br /> <br />Def~rred items (to ('lO/llIJ]~t(' In 1,500 c.f.~.J <br />MJin aque(luct . <br />Terminal stoTJ.ge <br />DeJi\ery lines .:nm <br /> <br />TtJI~d rldern'd CU.q _ <br /> <br />S 12,888,000 <br />] 3.320.000 <br />...... ,,8,4B4.000 <br />_ ":u.? ~4,~I).?OOO <br /> <br />TOlal ultimule con~!ruclil)n r,u~t. f:,c1u!>i\'e of water <br />s{lftellin~ mmm.. ....... .__........m. .m.$2R.'3.5,36,000 <br /> <br />Estimated Ct)~t of water ~ohenillg not illcluued in <br />bond issue estimate <br />Initial pbnl . <br />H;dl.cdl'arlty I'lilllt~ <br />Full.cartlcit'y plants ...... ........n... <br /> <br />PRESE~T <br />ESTDl.-\TE <br />JUNE 30,1940 <br />S 8.000.000 <br />1 :\4-,000.000 <br />15.000,000 <br />42,000,000 <br /> <br />SI99,000.000 <br /> <br />S ]9.500.000 <br />5.400,000 <br />3..600.000 <br />$ S9,500,000 <br /> <br />$25R,snOJJOo <br /> <br />S (3,770,000_1 <br />19.000,000 ) <br />16,500.000 <br /> <br />Tota] ultimate constrllction C(l~t. inclu<;i\'e of waler <br />~oftf.'ning nn S2iS,OOO,OOO <br />The Pl'esent estimate of initial cost, including provision for two <br />more pump units in each pumping plant, and additional distribution <br />system lines, shows a saving of approximately $20,000,000 in the <br />construction of this first development. What at this time are COIl- <br />sidered conservative estimates of the cost of the deferred items, <br /> <br />, <br />r, <br />,) <br />