<br />IN'I'J{OOUCTION
<br />
<br />.,
<br />
<br />Broadcasting System. The Gene reservoir was filled and Gene
<br />pumps were started on January 26, 1939. Copper Basin reservoir
<br />was filled, and on March 13th Colorado River water was released
<br />into Whipple Mountain tunnel. The Iron Mountain pumps began
<br />operating on April 5th, those at Eagle Mountain on April 10th, and
<br />Hayfield, the fifth and last lift, on July 25, 1939. First Colorado
<br />River water flowed f,'om Valverde tunnel into the Cajalco basin on
<br />November 2, 1939.
<br />The project is now approaching the position of ability to deliver
<br />water to cities within the District. It is possible to forecast quite
<br />closely the cost of the initial development contemplated when bonds
<br />were voted September 29, 1931. The following tabulation compares
<br />the present estimate of cost with that published in July 1931, prio,'
<br />to the bond election. It also gives the present estimate of cost of
<br />the deferred items to complete the project to its full ultimate capa-
<br />city of 1,500 cubic feet per second.
<br />
<br />COLORADO RIVE!! AQUEDUCT COST ESTl~L\TF.S
<br />
<br />Initial t'OIl~lrucljon (to delin'r 750 c.Ls,)
<br />Dil"ersiull darn __m. ...m...... .......m..
<br />~hin 3qll~dllr:t .
<br />Terminal ~lOra"~
<br />Delhery lin('~ l:" .
<br />
<br />Tota] inili:l] ('II"l
<br />
<br />BOI\'D ISSUE
<br />ESTD1ATE
<br />JULY 1931
<br />.... S 13.058.000
<br />.... 1.3.470.000
<br />mm... 17.352.000
<br />44.964.000
<br />..m.!218.8H.000
<br />
<br />Def~rred items (to ('lO/llIJ]~t(' In 1,500 c.f.~.J
<br />MJin aque(luct .
<br />Terminal stoTJ.ge
<br />DeJi\ery lines .:nm
<br />
<br />TtJI~d rldern'd CU.q _
<br />
<br />S 12,888,000
<br />] 3.320.000
<br />...... ,,8,4B4.000
<br />_ ":u.? ~4,~I).?OOO
<br />
<br />TOlal ultimule con~!ruclil)n r,u~t. f:,c1u!>i\'e of water
<br />s{lftellin~ mmm.. ....... .__........m. .m.$2R.'3.5,36,000
<br />
<br />Estimated Ct)~t of water ~ohenillg not illcluued in
<br />bond issue estimate
<br />Initial pbnl .
<br />H;dl.cdl'arlty I'lilllt~
<br />Full.cartlcit'y plants ...... ........n...
<br />
<br />PRESE~T
<br />ESTDl.-\TE
<br />JUNE 30,1940
<br />S 8.000.000
<br />1 :\4-,000.000
<br />15.000,000
<br />42,000,000
<br />
<br />SI99,000.000
<br />
<br />S ]9.500.000
<br />5.400,000
<br />3..600.000
<br />$ S9,500,000
<br />
<br />$25R,snOJJOo
<br />
<br />S (3,770,000_1
<br />19.000,000 )
<br />16,500.000
<br />
<br />Tota] ultimate constrllction C(l~t. inclu<;i\'e of waler
<br />~oftf.'ning nn S2iS,OOO,OOO
<br />The Pl'esent estimate of initial cost, including provision for two
<br />more pump units in each pumping plant, and additional distribution
<br />system lines, shows a saving of approximately $20,000,000 in the
<br />construction of this first development. What at this time are COIl-
<br />sidered conservative estimates of the cost of the deferred items,