Laserfiche WebLink
<br />1170 <br /> <br />I <br />. <br /> <br />2 <br /> <br />METROPOLITAN WATER DISTRICT <br /> <br />As described in the history and first annual report, this initial <br />development of the project provides for construction of certain <br />features to ultimate size or capacity, and other readily divisible <br />features to half capacity, or less, with later expansion as the need <br />for water develops. The pumping plants, for example, have a sub- <br />structure of full size for nine pumps, superstructure for five pumps, <br />and three pumps are now installed with a capacity of 200 cubic <br />feet per second each. <br />During the period covered by this report the main aqueduct <br />portion of the project, from the Intake pumping plant to Lake <br />Mathews in the Cajalco basin was virtually completed and 51,000 <br />acre feet of water delivered to Lake Mathews storage in connection <br />with testing the five pumping plants. There remain only some <br />minor additions to housing facilities at the camps, completion of <br />the installation, now in progress, of lightning arresters on the <br />230,000-volt transmission lines, and provision at each pumping <br />plant of a standby gas engine-driven generator to supply power <br />in emergency for lighting and camp uses. On the distribution <br />system the entire upper feeder is completed, extending through <br />Pasadena to its terminus in Glendale. The feeder from Eagle <br />Rock Canyon to Palos Verdes reservoir is finished, as well as lat- <br />erals to the city limits of Compton, Torrance, and Long Beach. <br />This feeder on its southerly course passes through the Eagle Rock <br />and Highland Park sections of Los Angeles, through the west side <br />of South Pasadena, through the east side of Los Angeles, with a <br />lateral to the Ascot reservoir, through Vernon, and continues south- <br />westerly in county territory to the Palos Verdes Hills. <br />On the Glendale-to-Santa Monica feeder construction of a short <br />tunnel through the Hollywood hills under Mulholland Highway is <br />in progress; contracts have been awarded and pipe is being fabri- <br />cated for the portion from the west portal of San Rafael No. 2 <br />tunnel in Glendale to Burbank; and contracts were awarded June <br />28, 1940 on the remaining portions between Burbank and Santa <br />Monica. Specifications were issued June 21, 1940 for the Orange <br />County feeder with bid opening set for July 10, 1940. At the water <br />softening and filtration plant on the upper feeder, work is ahead <br />of schedule, and construction will soon be under way on the waste <br />water disposal line from the plant to Whittier, where connection <br />can be made to the existing Los Angeles County sewer system. <br />On January 7, 1939 the official starting of the Intake pumps was <br />celebrated, the event being broadcast nationally by the Columbia <br /> <br />J <br />