My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12353
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSP12353
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:14:44 PM
Creation date
10/12/2006 5:32:42 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.300
Description
Colorado River Basin Salinity Control - Federal Agency Reports - USGS
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1996
Author
USGS
Title
Summary of Biological and Contaminant Investigations Related to Stream Water Quality and Environmental Setting in the Upper Colorado River Basin - 1938-95
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />w <br />l\;l <br />t.:l <br />;- <br /> <br />basin, biennial reports ~ere started in 1963 and have continued since <br /> <br />that time. These reports COver the basic studies and evaluations of <br /> <br />salinity conditions. the anticipated effects of additional develop_ <br /> <br />ments. the effect of salinity on water use. the potentials for salin- <br /> <br />ity control, and other related water quality aspects. <br /> <br />The Colorado River Basin Water Quality Control Project was established <br /> <br />in 1960 by the U.S. Public Ilealth Service. These functions were later <br /> <br />transferred to the Federal Water Quality Administration within the <br /> <br />Department of the Interior and, subsequently, transferred to the <br /> <br />Environmental Protection A~cncy. The early project investiR3tions <br /> <br />assisted in better defining the water quality conditions of the basin. <br /> <br />In 1963. efforts were directed towards evaluating various salinity <br /> <br />problemsa <br /> <br />In 1968. the FWQA and the Bureau of Reclamation initiated a joint <br /> <br />reconnaissance salinity control study in the Upper Basin to identify <br /> <br />potential Controllable sources of salinity. make preliminary assess_ <br /> <br />ments of the technical feasibility of the control measures. and <br /> <br />derive initial COst estimates for installation and operation of such <br /> <br />measures. The first year of the study was financed by the FWQA. which <br /> <br />transferred funds to the 8ureau of Reclamation. and the second year of <br /> <br />""ork was financed by the Bureau. Upon completion of the reconnaissance <br /> <br />studies. HiQA proposed to finance feasibility studies; however. budget <br /> <br />restrictions in fiscal year 1970 prevented fundin~ the studies. <br /> <br />6 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.