My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12318
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSP12318
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:14:35 PM
Creation date
10/12/2006 5:31:12 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100
Description
CRSP
Basin
Colorado Mainstem
Date
9/1/1980
Author
USDOI/BOR
Title
Review of Colorado River Storage Project and Related Individiual Participating Projexts, Water and Power Resources Service
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />The average CRSP power generation of 6 billion kilowatt hours annually is <br />dedicated first to project pumping and other project use purposes. Remaining <br />project power is distributed over a high voltage transmission system totaling 1,330 <br />miles to key load points in the marketing area and sold commercially to preference <br />customers. The market area for this power spans over three Service regions (the <br />Upper and Lower Colorado, and the Lower Missouri), and includes a northern <br />division comprised of the states of Coiorado, New Mexico, Utah and Wyoming, and <br />a southern division comprised of Arizona and parts of Nevada and California. <br /> <br />Following are the presently installed hydroelectric nameplate generating capaci- <br /> <br />ties: <br /> <br />CRSP <br />Glen Canyon Power Plant <br />Flaming Gorge Power Plant <br />Curecanti Unit - Blue Mesa Power Plant <br />Curecanti Unit - Morrow,Point Power Plant <br />Curecanti Unit - Crystal Power Plant <br />Subtotal <br /> <br />Megawatts (MW) <br />950 <br />108 <br />60 <br />120 <br />28 <br />1,266 <br /> <br />Participating Projects <br />Seedskadee Project - Fontenelle Power Plant <br />Grand Total <br /> <br />10 <br />1,276 <br /> <br />Future power developments planned are the 23 MW plant of the Navajo Indian <br /> <br />Irrigation participating project and three potential plants of the Central Utah <br /> <br /> <br />participating project which are expected to have 133.5 MW of capacity. Addition <br /> <br /> <br />of the aforementioned plants will bring the total installed capacity to 14-32.5 MW. <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.