My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12287
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSP12287
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:14:29 PM
Creation date
10/12/2006 5:29:59 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.10.C
Description
Glen Canyon Dam/Lake Powell
State
AZ
Basin
Colorado Mainstem
Date
9/1/1997
Author
USDOI-GC Mon & Rsrch
Title
Development of Monitoring and Research Programming for the Grand Canyon Monitoring and Research Center - Briefing Document - Adaptive management Work Group - Part 2 of 2
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CHAPTER 1 <br />ANNUAL PROGRAM PLANS AND <br />THE LONG-TERM STRATEGIC PLAN <br /> <br />INTRODUCTION <br /> <br /> <br />The Fiscal Year 1998 Annual Monitoring and Research Plan (Annual Plan) represents the <br /> <br /> <br />first year of implementation ofthe Long-Term Monitoring and Research Strategic Plan (Strategic <br /> <br /> <br />Plan). The two plans taken together are the required instruments for implementing science <br /> <br />programs of the Grand Canyon Monitoring and Research Center (GCMRC). <br /> <br />The Strategic Plan, drafted for fiscal years 1998-2002, will be reviewed by the Adaptive <br /> <br /> <br />Management Work Group (AMWG), as specified under the Grand Canyon Protection Act <br /> <br /> <br />(GCP A) and Glen Canyon Dam EIS (GCDEIS). The Strategic Plan and associated funding will <br /> <br /> <br />be approved by the Secretary of the Interior prior to implementation. <br /> <br /> <br />The Strategic Plan recommends monitoring and research strategies to determine the effect <br /> <br /> <br />of the Secretary's actions on the natural, recreational, and cultural resources of Grand Canyon <br /> <br /> <br />National Park and Glen Canyon National Recreation Area as specified in the Grand Canyon <br /> <br /> <br />Protection Act. General strategies outlined in the Strategic Plan must be made more definitive by <br /> <br /> <br />drafting specific monitoring and research proposals to be implemented within a given year or <br /> <br /> <br />across several years of the Strategic Plan. The GCMRC's Annual Plan accomplishes the goal of <br /> <br />Final Draft <br /> <br />1 <br /> <br />'-.' . <br /> <br />'- <br />
The URL can be used to link to this page
Your browser does not support the video tag.