My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12230
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSP12230
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:14:20 PM
Creation date
10/12/2006 5:28:13 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.500.10
Description
Glenwood-Dotsero Springs Unit - Salinity Control Projects- Aquatrain
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/19/1982
Title
Management Summary Hydraulic Design and Cost Estimate for a Coal Water Capsule Pipeline
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />c~ <br />r- <br />C""j <br />.-I <br /><... ~ <br /> <br />c.:...; <br /> <br />COL.O SCHOOL OF MINES RESEARCH .'TUTE <br /> <br />5 <br /> <br />Once on the conveyor belt, the coal capsules could be emptied and the <br /> <br />']iJ <br />::J <br />-.tt. <br />j\ <br /> <br />coal would be handled in a conventional manner. As an alternative, the <br /> <br />capsules could be loaded directly onto ships for export. Separat~on of the <br /> <br />coal and capsule would then be handled by the customer. <br /> <br /> <br />The capital cost estimate for what appears to be the best pipeline <br /> <br />system, pumps, and so forth is 1,604.81 million 1981 dollars. This figure <br /> <br />does not include capsule manufacturing, capsule recovery, or terminal <br /> <br />~. <br /> <br />facilities at Oxnard. <br /> <br />Annual operating costs for the system moving 15 million tons estimated <br /> <br />to be: <br /> <br />~- <br />i <br />-~. <br />- . <br />. <br /> <br />....};' <br />'T <br /> <br /> $/yr $/ton <br />Labor and Supervision $ 1,778,540 $ 0.119 <br />Materials and Supplies 14,544,000 0.970 <br />Utilities 29,884,000 1. 992 <br />Labor and Other Overhead 1,287,500 0.086 <br />Subtotal $ 47,495,040 $ 3.166 <br /> <br />Depreciation 45,597,000 3.040 <br />Property Taxes 4,154,000 0.277 <br />Insurance 6,066,000 0.404 <br />Finance Charge 104,626,600 6.975 <br />Subtotal $160,443,600 $10.696 <br />Total $207,938,640 $13 ,862 <br /> <br />.. <br /> <br />At 10 million tons per year the estimated cost is about $19 per ton of <br /> <br />coal delivered. <br /> <br />-.:' -. <br /> <br />::. ..~ <br /> <br />., <br /> <br />. ~ <br /> <br />> <br />
The URL can be used to link to this page
Your browser does not support the video tag.