My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12143
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSP12143
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:20:01 PM
Creation date
10/12/2006 5:24:50 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8410.350
Description
Platte River Basin - Basin Multistate Organizations - Missouri Basin IAC
State
CO
Basin
South Platte
Water Division
1
Date
12/21/1959
Author
Corps of Engineers
Title
1959 Year-End Progress Report - US Army Engineers Planning and Construction in the Missouri River Basin
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,~~' <br /> <br />s~~ 002611'; <br /> <br />'HSJcember 1959 <br /> <br />~.t~tl <br />~~:~~ <br />~~)i <br />1f,,~:;'.'i <br />~&:..}.~: <br />.J.',_,. <br /> <br />PROGRESS OF CIVIL WORKS PROGRAM <br /> <br />IN STATE OF COLORADO <br /> <br />There are no Civil Works projects currently under construction in <br />the portion of Colorado under the jurisdiction of the ;Missouri River <br />Division. <br /> <br />An investigation of the South Platte River to determine what modi- <br />fication of authorized Corps of Engineers projects is desirable and <br />compatible with current developments in the basin is presently in pro- <br />gress. The authorized Chatfield Resel'Voir became impracticable of con- <br />struction because of development which took place in the reservoir area <br />after authorization. Consideration is being given to water conservation <br />as well as flood control. Separately authorized surveys of Sand Creek, <br />the Cache la Poudre River at Greeley, and Clear Creek at Golden will be <br />combined with the South Platte River survey. The report is tentatively <br />scheduled for completion in 1963, <br /> <br />~~t:. <br />;~1~q~ ~ <br />~~~~.t.:;... <br />.,;."..:. <br /> <br />IN STATE OF COLORADO <br /> <br />:.-...::-?< <br />?;;i._ <br />""-'-'.. <br />~t~~ <br />I <br /> <br />;y.,:t~~ <br /> <br /> <br />i <br /> <br /> <br />f:::;-.:.;t-, <br /> <br /> <br />! <br /> <br /> <br /> <br /> <br /> <br /> <br />,Ji# <br /> <br />Ii <br />rl~I;' <br /> <br />~'i:::_;:~ <br />t~:~~~;; <br />;.:.",",";. <br /> <br />An investigation of the Republican River at Wray, Colorado is cur- <br />rently inactive due to lack of funds. <br /> <br />Public Law 685, 84th Congress, authorizes the Secretary of the <br />Army to undertake construction of small flood control projects not <br />specifically authorized by Congress when the Federal cost does not ex- <br />ceed $400,000 and the project is complete in itself. Local interests <br />must provide local cooperation similar to that required for projects <br />specifically authorized by Congress. Construction can be undertaken <br />only after studies adequate to demonstrate the economic feasibility <br />have been made. <br /> <br />A reconnaissance study of Niver Creek', undertaken under authority <br />of Public Law 685, is well advanced and involves potential improvement <br />of the creek outlet. However, studies to date indicate that the cost <br />of improvement will be well in excess of the $400,000 limitation <br />imposed on projects under this provision. <br /> <br />MILITARY CONSTRUCTION IN PROGRESS <br /> <br />All of Colorado is included in the area of Corps military con- <br />struction responsibility for the Army and Air Force in the Missouri <br />River Division. This currently involves six defense installations in <br />the state. <br /> <br />:i/{i- <br /> <br />-..~>~;'- . <br /> <br />~-. .." "-.:L~ <br /> <br />......: <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.