Laserfiche WebLink
<br />a;._ <br /> <br />. <br /> <br />. <br /> <br />Final Draft <br />10-27-82 <br /> <br />Task 12 - Evaluate Selected Alternatives <br /> <br />This task, along with Task 13, shall, constitute Phase II of <br />the Cache la poudre Study. The Contractor will refine (as <br />specified herein) and evaluate the four alternatives selected for. <br />further analysis in phase II. The four selected alternatives <br />are: <br /> <br />Alternative 1 -- Grey Mountain Reservoir <br /> <br />Alternative 2 -- Grey Mountain Reservoir and Idylwilde <br />Reservoir <br /> <br />Alternative 7 -- New Seaman Reservoir and Elkhorn Reservoir <br /> <br />Alternative 8 -- Elkhorn Reservoir <br /> <br />Task 12 shall consist of the following activities: <br /> <br />527 <br />grn <br />