Laserfiche WebLink
<br />o <br />o <br />("-, <br />Q") <br />w <br />w <br /> <br />TABLE S.2 <br /> <br />DESCRIPTIVE AND DIMENSIONAL DATA FOR ALTERNATIVE RESERVOIRS <br /> <br />WOLFORD <br />MOUNTAIN <br />C <br /> <br />Dam Type <br />Location <br />Height of Dam <br />Dam Crest Length <br />Reservoir Volume <br />Land Required <br />Hydropower Capacity <br />Potential Generation <br />Railroad Relocation <br />Highway Relocation <br /> <br />Embankment <br />Muddy Creek <br />120 feet <br />1700 feet <br />60,000 af <br />1900 acres <br /> <br />0.9 miles <br /> <br />WOLFORD <br />MOUNTAIN <br />A' <br /> <br />Dam Type <br />Location <br />Dam Height <br />Dam Crest Length <br />Reservoir Volume <br />Land Required <br />Highway Relocation <br />Pump Station <br />Off Site Source <br />Inlet Conduit length <br /> <br />Embankment <br />Muddy Creek <br />140 feet <br />3000 feet <br />120,000 af <br />2750 acres <br />0.8 mile!? <br />1 each 2) <br />Colorado <br />3.9 miles <br /> <br />RED <br />MOUNTAIN <br /> <br />RCC <br />Colorado <br />85 feet <br />1700 feet <br />140,000 af <br />3300 acres <br />1300 kW <br />3.4 GWh!yr 1) <br />9.0 miles <br />6.6 miles <br /> <br />HIGH <br />WOLCOTT <br /> <br />Embankment <br />Alkali Creek <br />382 feet <br />4200 feet 3) <br />350,000 af <br />2850 acres <br />7.8 mile!? <br />2 each 4) <br />Eagle & Colorado <br />6.3 miles <br /> <br />AZURE <br /> <br />UNA <br /> <br />Concrete Arch <br />Colorado <br />225 feet <br />500 feet <br />85,000 af <br />1150 acres <br />7000 kW <br />36.2 GWh!yr 1) <br />2.8 miles <br /> <br />RCC <br />Colorado <br />130 feet <br />2550 feet <br />150,000 af <br />3800 acres <br />17,600 kW <br />88.5 GWh!yr 1) <br />9.0 miles <br />7.0 miles <br /> <br />LOW <br />WOLCOTT <br /> <br />Embankment <br />Alkali Creek <br />288 feet <br />2760 feet <br />160,000 af <br />1950 acres <br />7.8 mile~ <br />1 each 4 <br />Eagle <br />0.8 miles <br /> <br />1) Annual hydropower generation from estimated flows in a year of average reservoir operation. <br />One gigawatt-hour (GWh) equals one million kilowatt-hours (kW). <br /> <br />2)' Pumping from the Colorado River is an alternative that would add about 10 percent to the <br />yield of Wolford Mountain A'. <br /> <br />3) High Wolcott also requires two saddle dams with a total crest length of 4300 feet. <br /> <br />4) Essentially all flows stored at Wolcott would be pumped; in the case of High Wolcott water <br />would be diverted and pumped from both Eagle River and Colorado River and for Low <br />Wolcott, only from Eagle River. <br /> <br />6 <br />