Laserfiche WebLink
<br />o <br />o <br />() <br />en <br />C}\ <br />--1 <br /> <br />TABLE 2.1 <br /> <br />RESERVOIR SITES AND CAPACITIES SELECTED <br />FOR RECONNAISSANCE INVESTIGATION <br /> <br /> Total <br />Reservoir Storaoe (af) <br />Wolford Mountain A' 120,000 <br />Wolford Mountain C 60,000 <br />Red Mountain 140,000 <br />Azure 85,000 <br />Wolcott <br />High 350,000 <br />Low 160,000 <br />Una 150,000 <br /> <br />Minimum <br />Pool (af) <br /> <br />6,500 <br /> <br />6,500 <br /> <br />5,600 <br /> <br />5,300 <br /> <br />14,000 <br />14,000 <br /> <br />45,000 <br /> <br />Selected Convevance Route <br />Using the criteria of reliability, maintainability, environmental disturbance, length and <br />construction costs, the highway route appears to be the most favorable route. It is the shortest route <br />and would have the easiest access for construction and maintenance. It requires the fewest river <br />crossings and would create the least disturbance of the natural setting. The highway route was <br />selected for use in the operation studies and cost analysis. <br /> <br />2-6 <br />