Laserfiche WebLink
<br />] <br /> <br />~ <br />.~ <br /> <br />I, <br /> <br />) <br />I <br /> <br />.j <br /> <br />I <br /> <br />:-: <br />~ <br /> <br />l <br /> <br />J <br /> <br />. <br /> <br />ALTERNATIVE COMPARISONS <br /> <br /> <br />Single reservoirs of this Study were analyzed for their ability to meet Joint-Use Reservoir <br /> <br /> <br />requirements. These single reservoirs and combinations of reservoirs were also analyzed for their <br /> <br />ability to supply the greater yields necessary to meet Replacement Reservoir requirements based <br /> <br />upon the yield of Green Mountain Reservoir. A reservoir could initially serve Joint-Use Reservoir <br /> <br />requirements and later, in combination with additional constructed reservoir(s) also serve to meet <br /> <br /> <br />water exchange project requirements. <br /> <br />Joint-Use Reservoir Proiect: Yields from Wolford Mountain A' and C, Red Mountain and <br /> <br />Azure Reservoirs appear to be within range of the objective 30,000 af of annual yield for a Joint-Use <br /> <br />Reservoir. Comparative unit costs of yield from Joint-Use Reservoirs are presented in Table SA. <br /> <br />Green Mountain Exchanae Proiect: For Replacement Reservoir alternatives, analyses were <br /> <br />made of Wolcott Reservoir and combinations of reservoirs including Wolcott (Eagle) and Red <br /> <br /> <br />Mountain, Wolcott (Eagle) and Azure, Red Mountain and Una, and Wolford Mountain A' and Una <br /> <br /> <br />Reservoirs. <br /> <br />Two of the reservoir combinations, Red Mountain with Una, and Wolford Mountain A' with <br /> <br /> <br />Una, are shown on Table S.1 as being capable of fully replacing the 144,000 af yield of Green <br /> <br />Mountain Reservoir. Other reservoirs and reservoir combinations would only partially replace Green <br /> <br /> <br />Mountain Reservoir. In these cases, a portion of the capacity of Green Mountain Reservoir would <br /> <br />continue to serve its original function. <br /> <br />In order to compare alternatives in this study, it was assumed that the yield of Replacement <br /> <br /> <br />Reservoir(s) could be exchanged for an equal quantity of yield from Green Mountain Reservoir. The <br /> <br />actual quantities of exchange may differ from this Study depending upon the institutional <br /> <br />arrangements between the interested parties. <br /> <br />9 <br />