Laserfiche WebLink
<br /> <br />TABLE 1 <br /> <br />DETAILED ESTIl-lATE OF COST, <br /> <br />Item <br /> <br />Unit <br /> <br />Unit, : <br />Cost ': Quantity Item Cost: Total Cost <br /> <br />FEDERAL COST' <br /> <br />I - nIN DAM EMBANKMEl';'T <br /> <br />$105,100 <br /> <br />Excavation <br />Borrow <br />Embac"lkment <br />Random <br /> <br />C.Y. <br /> <br />, <br />:$6.38 <br /> <br />C.Y. <br /> <br />, O.:LO <br /> <br />140,000 <br />128,900 <br /> <br />$53,200 <br /> <br />I <br />CD <br />I, <br /> <br />Elope protection,.. Grass cover <br /> <br />Acre 4,000.00' <br /> <br />3.7 <br /> <br />12,890 . <br />14,800 <br /> <br />, <br /> <br />Subtotal <br />Engineering, contingencies and overhead <br /> <br />~i80,890 <br />24,210 <br /> <br />$105,100 <br /> <br />TffiAL <br />II ,.. CUTLET WalKS <br /> <br />21,400 <br /> <br />'Excavation <br />Unclas sified C.Y. 0.60 3,600 2,160 <br />Concrete <br />Intake structure, stilling <br />basin and conduit C.Y. 50.00 190 9,500 <br />~.te-el <br />Reinforcing Lb. 0.13 33,000 4,290 <br />\Ilaterstop, plate steel, 16 gage. . S.F.. 0.40 125 50 <br />1rash rack and handrail Lb. 0.30 1,500 450 <br /> <br />. <br /> <br />. <br /> <br />'. <br />