Laserfiche WebLink
<br />. <br /> <br />0469 <br />0.7 mile of road relocation would be required. Relocation of these <br />facilities from the reservoir area would be accomplished qy the city <br />or Trinidad at no expense to the Government. It has been estimated <br />that the cost of these relocations would amount to about ~i6,5oo. <br /> <br />IX - COST ESTI}ffiTES <br /> <br />9-01. Sunooaryi. The estimated total cost of the Pinon Canon Dam <br />project is ~,;175,000. This amount includes direct; construction costs <br />and items for engineering, overhead, contingencies, ~d costs of local <br />cooperation. The total Federal cost of the project is ~15o,ooo, and <br />the non-Federal cost is ~~25,ooo. These costs are sho.m in detail in <br />" table 1.' Unit costs .and lUJ1ip sUm prices used in 'this report are based <br />on current prices foi labor, and material. <br /> <br />X - SCHEDULES FOR PIANNING AND CONST~UCTION <br /> <br />10-01. Construction time.". The time required to complete con- <br />struction of the entire project .is estimated to be 6 months. The <br />proposed construction schedule showing the seque~ce of operation, the <br />time required for completion of the principal items 'Qf work, and an <br />estimate of funds required is presented on plate 5. ITt is proposed <br />to.,perform the work qy contr;act~ Pr.eparation of ;cont!ract plans and <br />specifications in the District office would req~e'l months time and <br />is estimated to cost ~i.3, 700. . <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />-7- <br /> <br />" <br /> <br />