My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12022
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP12022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:19:37 PM
Creation date
10/12/2006 5:21:21 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.500.20
Description
Glenwood-Dotsero Springs Unit - Salinity Control Projects - Cogeneration and Desalination
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
2/21/1989
Title
Solicitation No. 9-XX-40-07530 Entitled Preparation of Feasibility and NEPA Documents for Investigation and Potential Construction of Cogeneration Plant at Glenwood Springs Colorado
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1. Potential impact of facility construction and operation <br />on water quality other than salinity. Since salinity reduction is <br />included in criterion number E.1(a) this factor includes the impact of <br />the project on other water quality parameters. (0-20 points) <br /> <br />2. Potential impact of facility construction and operation <br />on air quality. Describe the impact of construction and operation of <br />the project on air quality. (0-20 points) <br /> <br />3. Potential impact of facility construction and operation <br />on environmental resources such as fish, wildlife, and vegetative <br />resources. (0-20 points) <br /> <br />4. Potential impact of facility construction and operation <br />on noise pollution. (0-20 points) <br /> <br />5. Solid waste management - The environmental soundness of <br />the control of plant by-products and disposal of desalination process <br />by-prcoducts. (0-20 points) <br /> <br />6. Socio-economic impact of facility construction and <br />operation locally, within the county, and within the region. (0-20 <br />points) <br /> <br />(c) Company's Experience with Similar Projects <br /> <br />1. projects with similar desalination process, flow, and <br />tonnage capacity. (0-35 points) <br /> <br />2. National Environmental policy Act experience with similar <br />projects. (0-35 points) <br /> <br />3. Cogeneration projects with similar powerplant design and <br />capacity. (0-35 points) <br /> <br />(d) Project Support - Signed contracts, letters of support, <br />letters of intent, copies of permits, and other documents should be <br />included as an attachment to the proposal to document the level of <br />project support. <br /> <br />1. Expressed and potential local government and public <br />support. (0-10 points) <br /> <br />2. Existing or potential contract for the sale of power, <br />water, salt, and other by-products of the process. (0-30 points) <br /> <br />3. Existing permits. (0-10 points) <br /> <br />E-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.