Laserfiche WebLink
<br /> <br />TABLE 1. <br /> <br />2000 <br />APPARENT INFLOW TO HERON RESERVOIR <br /> <br />(UNIT = ACRE-FEET) <br /> <br />TABLE 1 WILLOW TRIBUTARY TRIBUTARY COMPUTED <br />Inflow to Heron AZOTEA COMPUTED CREEK INFLOW COMPUTED INFLOW NATURAL <br /> TUNNEL CHANNEL ABOVE ABOVE INFLOW WITHIN FLOW <br />MONTH OUTLET LOSS HERON HERON TO HERON HERON AT HERON <br /> RESERVOIR RESERVOIR RESERVOIR RESERVOIR RESERVOIR <br /> 13+2-1) (4)'FACTOR TBL2(3or4) 5+6 orSEEP <br /> (1) (2) (3) (4) (5) (6) m <br />JANUARY 0 0 0 0 0 154 154 <br />FEBRUARY 0 0 0 0 0 144 144 <br />MARCH 536 0 728 192 472 4344 4816 <br />APRIL 15864 32 17401 1569 1883 351 2234 <br />MAY 20987 42 20926 -19 0 147 147 <br />JUNE 5019 10 5148 139 342 0 342 <br />JULY 106 0 110 4 10 143 143 <br />AUGUST 229 0 . 127 -102 0 142 142 <br />SEPTEMBER 0 0 0 0 0 130 130 <br />OCTOBER 0 0 0 0 0 131 131 <br />NOVEMBER 0 0 0 0 0 1486 1486 <br />DECEMBER 0 0 0 0 0 624 624 <br />ANNUAL 42741 84 44440 1783 2707 7796 10493 <br /> <br />(5) ~OMPUTED INFLOW TO HERON RESERVOIR=TRIBUTARY INFLOW ABOVE HERON <br />TIMES CORRELATION FACTOR (1.2 FOR MONTHLY WILLOW CREEK NATURAL <br />FLOW ABOVE 360 AF AND 2.46 FOR FLOW AT 360 AF AND BELOW. IF THE <br />INFLOW DOES NOT EXCEED THE SEEPAGE THIS FLOW IS NOT BYPASSED. <br />FLOWS ABOVE THE SEEPAGE ARE BYPASSED.) <br /> <br />(6) THIS COLUMN REPORTS THE SEEPAGE 2(4) AS THE BASE NATURAL FLOW OR <br />THE NET GAIN ON RESERVOIR 2(3) WHICH EVER IS GREATER ORZERO WHEN <br />2(3) IS ZERO AND 1 (5) IS MORE THAN SEEPAGE. (SEE TABLE 2) <br /> <br />(7) THIS COLUMN REPORTS THE SUM OF 1 (5) AND 1 (6) ONLY WHEN 1 (5) EXCEEDS <br />THE SEEPAGE. THIS WILL PREVENT ANY DOUBLE ACCOUNTING OF THE BASE <br />NATURAL FLOW (SEEPAGE). IF 1(5) IS LESS THAN OR EQUAL TO SEEPAGE THEN <br />1(7) EQUALS 1(6). <br />