Laserfiche WebLink
<br />SAN JUAN-CHAMA <br />WATER ACCOUNTING <br />ALBUQUERQUE PROJECTS OFFICE <br />JUNE 1994 <br /> <br />The natural inflow into Heron Reservoir during the month of June was computed to <br />be 340 acre-feet (af) as shown on Table 3. Net San Juan-Chama losses were <br />2,370 af as shown on Table 2. There were 12,320 af of San Juan-Chama water <br />diverted through Azotea Tunnel during June. <br /> <br />There was no San Juan-Chama release from Heron for the month of June. <br /> <br />A summary sheet is provided for water delivered from Heron, E1 Vado, and Abiquiu <br />Reservoirs. <br /> <br />Total precipitation reported at Heron Reservoir for the month of June was <br />0.98 inches which is 88% of normal. The monthly computations for Heron Reservoir <br />are summarized in Tables 1-3. <br /> <br />Total inflow into Nambe Falls Reservoir was computed to be 4,130 af. Evaporation <br />loss on the reservoir was 21 af. Table 4 summarizes San Juan-Chama water at <br />Otowi. <br /> <br />Estimated sediment deposition in the San Juan-Chama pools at Cochiti, Abiquiu, <br />and Jemez Canyon Reservoirs are presented in Tables 5A-5C. <br /> <br />Storage and evaporation of Rio Grande water in E1 Vado and Abiquiu reservoirs are <br />shown on Table 6. <br /> <br />All data are provisional and subject to revision as final data are collected and <br />analyzed. <br />