Laserfiche WebLink
<br />1994 <br /> <br />TABLE 1. <br /> <br />APPARENT INFLOW TO HERON RESERVOIR <br /> <br />(ROUNDED TO NEAREST 10 ACRE-FEET) <br /> <br />TABLE 1. WIlLOW 1RIBUTARY 1RIBUTARY COMPU1ED <br />Inflow to Heron AZOTEA COMPUlED CREEK INFLOW COMPU1ED INFLOW NAWRAL <br /> WNNEL CHANNEL ABOVE ABOVE INFLOW WIllIlN FLOW <br />MONTII OUlLET LOSS HERON HERON TO HERON HERON ATHERON <br /> RESERVOIR RESERVOIR RESERVOIR RESERVOIR RESERVOIR <br /> 13+2-1) f4\'PAcroR TBL?f3or4\ 5 +6 orSEBP <br /> (!) (2) (3) (4) f5\ f6\ m <br />JANUARY 0 0 20 20 50 160 160 <br />FEBRUARY 0 0 30 30 80 2070 2070 <br />MARCH 0 0 9780 9780 11740 2420 14160 <br />APRIL 21060 40 24050 3030 3640 3130 6770 <br />MAY 48080 100 45660 -2320 0 700 700 <br />JUNE 12320 20 11920 -380 0 150 150 <br />JULY 780 0 840 60 150 160 160 <br />AUGUST 31 0 60 29 70 160 160 <br />SEPTEMBER 30 0 40 10 20 150 150 <br />OCTOBER <br />NOVEMBER <br />DECEMBER <br />ANNUAL 82301 160 92400 10259 15750 9100 24480 <br /> <br />(5) COMPU1ED INFLOW TO HERON RESERVOIR=TRIBUTARY INFLOW ABOVE HERON <br />TIMES CORRELATION FACTOR (1.2 FOR DAILY WILLOW CREEK NATURAL FLOW <br />ABOVE 6 CFS AND 2.5 FOR FLOW AT 6CFS AND BELOW) (IF THE COMPU1ED INFLOW <br />DOES NOT EXCEED THE SEEPAGE TIDS FLOW IS NOT BYPASSED. FLOWS ABOVE <br />THE SEEPAGE ARE BYPASSED.) <br /> <br />(6)TIDS COLUMN REPORTS THE SEEPAGE 2(4) AS THE BASE NATURAL FLOW OR THE <br />NET GAIN ON RESERVOIR 2(3) WIDCH EVER IS GREATER OR ZERO WHEN 2(3) IS <br />ZERO AND 1(5) IS MORE THAN SEEPAGE. (SEE TABLE 2) <br /> <br />(7) TIDS COLUMN REPORTS THE SUM OF 1(5) AND 1(6) ONLY WHEN 1(5) EXCEEDS THE <br />SEEPAGE. TIDS WILL PREVENT ANY DOUBLE ACCOUNTING OF THE BASE <br />NATURAL FLOW (SEEPAGE). IF 1(5) IS LESS THAN OR EQUAL TO SEEPAGE THEN <br />1(7) EQUALS 1(6). <br />