Laserfiche WebLink
<br />" "'." <br /> <br />.. <br />. <br />'. <br />. <br />. <br />. <br />. <br />. <br />. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Summary <br /> <br />The staffs meet and developed three work products related to improving co=unications, <br />categorizing the water issues matrix and determining the delivery deficits on Kansas Section II <br />releases, These work products should continue to advance issues towards resolution. <br /> <br />The staffs did discuss rotating the duties of the Operation Secretary between the respective <br />States. There was no direct work product that could be associated with these discussions. <br /> <br />Steve Miller, CWCB, did present a proposal for permanent pool evaporation and an <br />additional water source for the permanent pool and other Colorado Division of Wildlife projects <br />along the Arkansas River mainstem. Those disl,;ussions "1Iill be reviewed with David Pope, the <br />Kansas ARCA Co=issioner who sits on the ARCA Engineering Committee. <br /> <br />cc: Mark Rude <br />Steve Witte <br />David Pope <br />Steve Miller <br /> <br />October 2003 Work Product <br />Page 3 oF3 <br /> <br />Revision Date: 31 October 2003 (9:24 am) <br />Lastpnnted 11/13/2003 5:57PM <br />