Laserfiche WebLink
<br />iii <br /> <br /> <br />.... <br />GO <br />0') <br />OJ <br /> <br />TABLE OF CONTENTS <br /> <br />INTRODUCTION <br /> <br />UNDERLYING POLICIES, GUIDELINES, AND ASSUMPTIONS <br />G.entral Arizona Project <br />Hydrology <br />Financial <br /> <br />PROJECT DESCRIPTION <br />Purpose <br />Dual-Purpose Nuclear Desalting Plant <br />Conveyance System <br />Project Costs <br /> <br />ECONOMIC AND FINANCIAL ANALYSIS <br />E~onomic Costs <br />Total Project Costs <br />Project Benefits <br />Benefit-Cost Ratio <br />Cost Allocation <br />Repayment Analysis <br /> <br />AIXERNATlVE PLANS <br />Basic Route, 2.5 Million Acre-Feet <br />Alternative Routes <br /> <br />CONSIDERATIONS FOR FEASIBILITY STUDIES <br />Coordination with Mexico-U.S.A. Desalting <br />Proposal Studies <br />National Water Commission <br />Need for Additional Augmentation <br />Potential Pumped Storage <br />Impact of Weather Modification <br />Impact of Water Salvage Measures <br /> <br />CONCLUSIONS <br />