Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />. ".... .~, .. <br />,~v W '...1 <br /> <br />contract. With the exception of the portion of the relocation of <br />State Highway 144 over the dam, it is assumed that the Colorado <br />Department of Highways' will provIde the designs, specifications and <br />contract administration coordinating the work with the Bureau of <br />Reclamation. A period of 4 years has been allotted for construction <br />of the highway to perlLlit 2 years for the subgrade construction, one <br />year of seasoning and one year for placement of the pavement. The <br />highway relocation on the dam will be part of the dam contract. <br /> <br />Rights-of-way are scheduled to be ac~uired as they are needed <br />in order that production on the land may continue as long as possible <br />up to the time the land is needed for construction or reservoir storage <br />purposes. Clearing of the reservoir area is scheduled to be completed <br />about the time when storage in the reservoir will begin. <br /> <br />14 <br /> <br />Revised July 1966 <br />