Laserfiche WebLink
<br />co <br />00 <br />, '<::t' <br />...-/ <br />C-;;, <br />, r'-, <br />" ...... <br /> <br />A-5 <br /> <br />x <br /> <br />by ground water diversions from both the shallow and confined aquifers, <br /> <br />In recognition of the serious depletion caused to the Conejos River <br /> <br />7,000 acre-feet of the 10,000 acre-foot credit given Colorado under the, <br /> <br />provIsions of the Rio Grande Compact shalJ be credited to the Conejos <br /> <br />RIver delivery schedule and 3,000 acre-feet shall be credited to the Rio <br /> <br />Grande delivery schedule; <br /> <br />XI <br /> <br />currently in storage In Platoro Reservoir, said water being stored during <br /> <br />In recognition of the approximately 34,000 acre-feet of flood water <br /> <br />calendar year 1973, fifty (50) percent of that water shall be considered as a <br /> <br />credit to the 1974 Rio Grande delivery schedule and fifty (50) percent shall <br /> <br />be Considered as a credit to the 1974 Conejos River delivery schedule. This <br /> <br />water shall be released from Platoro Reservoir for delivery to Lobatos as <br /> <br />soon as PoSsible. Delivery schedules 'of the Conejos River and Rio Grande <br /> <br />will be adjusted to reflect these credits at such ~ as the water Is actually <br /> <br />delivered to La Sauses. <br /> <br />DETAILED CRITERIA - RIO GRANDE AND ITS TRffiUTARIES EXCEPT THE CONEJOS <br />RIVER <br /> <br />1. Runoff Estimate <br /> <br />a. Estimate total annual runoff at Del Norte from Soil Conservation <br /> <br />ServIce and other estimates for April - September on May 1, and, <br /> <br />USing a long term average monthly runoff pattern, extend the <br /> <br />estimate to a full year. <br />