My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11850
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11850
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:19:05 PM
Creation date
10/12/2006 5:13:49 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8510.100.40
Description
Rio Grande Compact Commission
Basin
Rio Grande
Water Division
3
Date
5/1/1974
Title
San Luis Valley Water Problems: A Legal Perspective - Part II of II
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />C\1 <br />en <br />'<j'1 <br />.--1 <br />C.- <br />C"l <br /> <br />A-lI <br /> <br />the long term average monthly runoff pattern, extend the estimate <br /> <br />for the index: stations to a full year. <br /> <br />2. January. February and March <br /> <br />a. There will be no direct flow divers ions from the Conej os <br /> <br /> <br />River and its tributaries during the months of ]unuury. February <br /> <br />and March except for those rights decreed for liS" tl1rou'1hout tho <br /> <br />year. In the event of unusual hydrologic or climutic conditions. <br /> <br />limited diversions may be permitted in March on a case by case <br /> <br />baSis Upon concurrence of the Division Engineer, the Conejos <br /> <br />River Water Conservancy District, and any other affected water <br /> <br />User organization. <br /> <br />3. April throuqh October <br /> <br />a. Direct flow diversions may commence upon a date to be <br /> <br />determined annually by the State Engineer after consultation <br /> <br />with the Conejos Water Conservancy District and other interested <br /> <br />entities. <br /> <br />b. Actual runoff at the Mogote Index Stations for the months of <br /> <br />- <br />January, February and March and the estimated runoff for <br /> <br />November and December will be combined to prOvide an <br /> <br />estimated supply at that station during the non-irrigation <br /> <br />season. The actual Conejos-River deliveries at La Sauses <br /> <br />gaging station for January, February and March will be combined <br /> <br />with the estimated deliveries at La Sa uses for November and <br /> <br />December, and deducted from the estimated annual delivery <br /> <br />requirement to proVide an estimated delivery requirement for <br /> <br />the remainder of the year. <br />
The URL can be used to link to this page
Your browser does not support the video tag.