Laserfiche WebLink
<br />Reservoir Spills <br /> <br />13. It is understood that whenever it is required <br />to evacuate space in east slope project reservoirs to <br />meet the necessities of project flood control and <br />power gene rot ion purposes, the water to be so <br />evacuated and spilled from Pueblo Reservoir shall be <br />charged first against any winter storage accumula- <br />tions and then against any project water accumulated <br />from the Arkansas River and its tributaries. <br /> <br />United States Not Liable for Water Shortage <br /> <br />14. (a) The United States and the District ac. <br />knowledge that whereas the feasibility of the pro- <br />ject is dependent upon the coordinated use of project <br />works and the project water supply for irrigation, <br />municipal and power production purposes, the de- <br />pendence of this feasibility upon power revenues in <br />the return of reimbursable project costs requires 0 <br />continuing reserve of project water in project reser- <br />voirs to assure continued optimum power production. <br />This reserve of stored water is estimated to be <br />135,000 acre-feet, but the continuing quantity of such <br />reserve shoJI be determined by the Secretary, after <br />consultation with the District, Thus, there may occur <br />during any year a shortage in the quantity of project <br />water available for furnishing to the District, notwith- <br />standing the existence of project water in the reserve <br />maintained for power production. Notwithstanding <br />any shortage in the availability of proiect water for <br />irrigation purposes, the District's annual obligation to <br />the United Stotes under Subsection 11 (a) (1) shall not <br />be diminished. <br /> <br />(b) The United States assumes no responsibility <br />with respect to and does not warrant the quality of <br />water to be furnished pursuant to this contract. <br /> <br />Limitation on Transmountain Diversion of Water <br /> <br />15. The project shall be operated under the di- <br />rection of the Secretary in accordance with the op' <br />erating principles set out in House Document 130, <br />87th Congress, and amendments thereto, and the use <br />of water diverted from the Fryingpan River and its <br />tributaries and from Hunter Creek - 0 part of the <br />Colorado River System - to the Arkansas River Basin <br />through proiect works and the operation and main- <br />tenance of such works shall be subiect to and con- <br />trolled by the Colorado River Compact, the Upper <br />Colorado River Basin Compact, the Boulder Canyon <br />Pr'1iecl il.ct (45 Stat. 1057), the Boulder Canyon Pro. <br />jed Adjustment Act (54 Stat. 774), the Colorodo River <br />Storage Project Act (70 Stat. 105) and the Mexican <br />Water Treaty (Treaty Series 994, 59 Stat, 1219). None <br />of the waters exported from the basins of the Fry- <br />ingpan River and Hunter Creek shall be available <br /> <br />8 <br /> <br />-rr <br /> <br />for consumptive use outside the State of Colorado by <br />exchange or otherwise, nor shall the obligations of <br />the State of Colorado under the provisions of the <br />Arkansas River Compact (63 Stat. 145) be altered by <br />any operations of the Fryingpan-Arkansas Project. <br /> <br />Agreed Charges a General Obligation of the District <br /> <br />16. The District as a whole is obligated to pay <br />to the United States the chCJrges becoming due as <br />provided in Article 11 (a) (1) of this contract, notwith- <br />standing the default in the payment to the District <br />by individual water users of assessments, tolls, or <br />other charges levied by the District. <br /> <br />Levy of Assessments, Tolls and Charges <br /> <br />17. The District sholl cause to be levied and <br />collected all necessary taxes, assessments, tolls, and <br />other charges, and will use all of the authority and <br />resources of the District to meet the obligations of <br />the District to make in full all payments to be made <br />pursuant to this contract on or before the date such <br />payments become due and to meet its other obliga. <br />tions under lhis contract, <br /> <br />Penalty for Delinquent Payments <br /> <br />18. Every installment or charge required to be <br />paid to the United States under this contract and <br />which ihall remain unpaid after it shall have become <br />due and payable, shall be subiect to a penalty of one- <br />half of one per cent per month from the date of <br />delinquency. <br /> <br /> <br />Refusal of Water in Case of Default <br /> <br />19. No water shall be furnished to the Distric: <br />during any period in which the District may be in <br />arrears in the advance payment of charges accruing <br />under this contract. No water shall be furnished by <br />the District pursuant to this contract for lands or <br />parties which are in arrears in the payment to the <br />District of any taxes, assessments, rates, tolls, or <br />rental charges levied or established by the District. <br /> <br />Water Acquired by District <br /> <br />Other Than from the United States <br />23, (0) The provisions of this contract shall not <br />be applicable to or affect water or water rights now <br />owned or hereafter acquired by the District or land- <br />owners within the District other than from the United <br />States; except for winter storoge as hereinbefore de- <br />fined, Wafer furnished pursuant to the terms of this <br />contract may be transported by means of the same <br />distribution facilities as water now available or which <br /> <br />9 <br /> <br />