Laserfiche WebLink
<br />SUMMARY (Continued) <br /> <br />%lK!ltT-COsr ANALYSIS (3.115 p.~e.Dt 1nt.~..t. 100 ,..~,) <br /> <br />Project conecruccloD COlt. <br />IQt.~.t durluc coaatructloa <br />Total <br />L... coat. of lu...tl.ltl0G8 aad coo- <br />cribucloaa prior to authorizatioft <br />L... COlt of highway relocatlOD' <br />Cou.tructloa co.c. <br />Inc.reat durlD1 c~tructloa <br />Tocal COIC of h1ghway <br />ralocatlou <br />Total project lu...t..nc <br />Amwal op.nti01l, _lnt.Galle., Ind ra- <br />plaeeM1lt COle. <br />A..lsa-d COlts of regulatory tacillti.. <br />of the Colorado River StoUS. Project <br />Total annual COlt <br />Annual bn.ef'ltl <br />Direct <br />Total <br />Slneftt-co.t ratio. <br />01'NCt <br />Total <br />Sat total anDUal benefitl, <br /> <br />Total <br />$1,82J;'I!J,OOO <br />264,944,000 <br />2,093,183,000 <br /> <br />Annual <br />equivalent <br />valua <br /> <br />-1,120,000 <br /> <br />-37,053,000 <br />-4,905,000 <br /> <br />-41.958.000 <br />2,050,105,000 <br /> <br />$67,161,000 <br /> <br />9,681,000 <br /> <br />352,000 <br />77,194,000 <br /> <br />102,391,000 <br />106,399,000 <br /> <br />1.33:1 <br />1.38:1 <br />$29,205,000 <br /> <br />SUMMARY OF COST ALLOCATIONS ($1,000) <br /> Reil8bur.able <br /> {ntault Annual <br /> durtn, operat1on, <br /> eonetructlon maintenance, <br /> C011ltructloa at 3.222 and replace- <br /> coaU percent ment eOIU <br />Coat allocation <br />Relabur.abl. cOlta <br />Irri,atioD $935,377 1,826 <br />Municipal and indultrtal watar 421,300 83,568 521 <br />Dllcontinued CRSP power ll, 390 S,'59 <br />Flood control 19 <br />F11h .ad wl1d11f. 3,966 <br />aecraaU.OD ~,~49 <br />Subtotal 1,368,067 89,121 , 81 <br />Noarelabun.bl. COIU - - <br />Flood control 17,131 <br />Recnation 60,823 <br />Ftlb add wildlife 344,565 <br />Highway fJlprove_nt 31,053 <br />Subtotal 460, 172 <br />Project total 1,828,239 !r,m' r.m <br /> <br />S-9 <br />