<br />SUMMARY (Continued)
<br />
<br />SllllIWlt 01' AHllUAL PItOJEcr 8EMEnTS
<br />
<br />Irrig.UOII
<br />Kunicip.l .nd indo..
<br />trial w.t.~
<br />Flood control
<br />Pilh .nd wildlife
<br />aeer..cIOD
<br />Total
<br />
<br />OirllCt
<br />b....fitl
<br />$11,206,000
<br />
<br />Indirect
<br />and
<br />pub11c
<br />b....fiu
<br />S4,008,000
<br />
<br />Total
<br />b...afitl
<br />St5,214,000
<br />
<br />76,444,000
<br />817,000
<br />7,092,000
<br />6,832,000
<br />102,391,000
<br />
<br />4,008,000
<br />
<br />76,444,000
<br />817 ,000
<br />7,092,000
<br />6,832,000
<br />106,399,000
<br />
<br />.22!!!
<br />
<br />Conatructlon COlt.
<br />Starvation 0... . . .
<br />Upp.r Stil1w.ter 0...
<br />CurraDt Creek Da.
<br />Soldi.r Creek De. snd Collection Works,
<br />lIou. 1Io11oor 0...
<br />
<br />..
<br />
<br />$22,567,000
<br />170,167,000
<br />32,891,000
<br />304,628,000
<br />54,676,000
<br />3,250,000
<br />363,453,000
<br />6,838,000
<br />7,105,000
<br />108,696,000
<br />24,245,000
<br />84,638,000
<br />39,874,000
<br />58,005,000
<br />102,036,000
<br />36,943,000
<br />15,817,000
<br />68,536,000
<br />8,185,000
<br />48,931,000
<br />6,968,000
<br />911,000
<br />15,958,000
<br />3,261,000
<br />13,627,000
<br />7,590,000
<br />2,183,000
<br />1,531,000
<br />30,120,000
<br />1)643,630,000
<br />
<br />~ 123,786,000
<br />60,823,000
<br />184,609.000
<br />
<br />1,828,239,000
<br />
<br />Koua D... . . . . . . . . . .
<br />Jordaaalle Da.. . . . . . . .
<br />Upper Provo River re.ervolr..
<br />Indi.n Pord Pumping PIsnt
<br />W...tch"Aqueduct. . . .
<br />H.phi-S.vter eo...l. , , ,
<br />Jordan Aqueduct S,.t... .
<br />Ouch... River Area CaUl! R.ehabilitation.
<br />Oi....nd Pork Pip.11... , . , ,. ,
<br />S,.r Tunael . . . . . . . . . . . . . .
<br />Fifth Water Aqueduct aad Tunnel . . . .
<br />Lalt Chane. Powerplant and Crana_l..1on facillti...
<br />Hona-Nephl Canal, Pu~lng Plant, and Lateral.
<br />W.at Mona Develop..nt . . . . . . . . . . .
<br />, HOllda PUapiD, Plantl, Canals, and Laterala
<br />Wa.ateh Aqueduct laterala .
<br />B.er Creek channel. . . . .
<br />Elberta Caaat and Laterala.
<br />raylor Canal area dralnl. .
<br />Bonnevilla Ba.io dralnl . .
<br />Dilcontinued lnve.tigatioD.--irrlgatlon and drainage.
<br />Par8aaant operet1ug facilities. .
<br />Oparation and malntenanca houaing
<br />Other projact calC. .
<br />Total Section 5.
<br />Pilh and wildlife . .
<br />aecr.attoo. . . . . .
<br />Tot.l Section 8.
<br />Total project coata.
<br />
<br />, .,
<br />
<br />. ,
<br />
<br />Oparation, ..int.nanca, and r.plaee..nt coats
<br />aecla..tioD and joint-u.e tactlitt...
<br />aecraation faciliti.a . . .
<br />Stree. fiaheri.. _ttisation
<br />Total. . . . . . . . .
<br />
<br />2,692,000
<br />3,349,000
<br />3/3,640,000
<br />9,681,000
<br />
<br />11 Land valued at $3,243,000 waa transterred to the State of Utah tor ue. by
<br />the Orvilion of Wildlife Resources.
<br />21 Of the $3,640,000 for stres. fishari.. mitig.~ion, $3,355,000 is for the
<br />lnatr... floW agre.ment. The eo.t of the ialtr.a. flow agr....nt will be paid by
<br />au appropriate managing agency.
<br />
<br />S-8
<br />
|