My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11697
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11697
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:18:33 PM
Creation date
10/12/2006 5:06:47 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8147
Description
Arkansas River Basin - Gunnison-Arkansas Project
State
CO
Basin
Arkansas
Water Division
2
Date
4/5/1949
Author
DOI-BOR
Title
Gunnison-Arkansas Project - Report of the Regional Director
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, . .,. <br />uu~J.. <br /> <br />Report of tho Regional Director <br /> <br />(a) In ctisposing of energy generated at the <br />project, to give preferonce and priority to pub- <br />lic bodies and cooperatives, ann, to this end, <br />to embody in oontraots with private purohasers <br />engagod in the businoss of selling olectric energy <br />to the goneral nublic, provisions that the Seore- <br />tory may cancol such contract up en reasonable no- <br />tioe in writing, if, in his judgmont, any part of <br />of the olectric enorgy purchasod uncer such con- <br />tract is likely to be noeded to satisfy the require- <br />ments of public bodies or cooperatives; and <br /> <br />(b) To establish Dower rates for the projoct <br />at the lowest possible ratos to consumers consis- <br />tent with the purposes hereinabovo sot ferth and <br />with sound businoss prineiplos, but in no ovent <br />less than suffioient to return within 0 reasonablo <br />poriod, in addition to the annual oporation and <br />maintonanco exponsos chargeable to powor and tho <br />annual amount requiren for maintonance of replace- <br />ment reservos, tho total oonstruction costs allo- <br />cated to powor together with interest on the unpaid <br />balance at the rote per annum provided by tho <br />Reclwnation Froject Act of 1939, os it may be <br />amondod from time to time, and the total costs <br />which aro assigned to bo returnod from power <br />revenues, though allocated to othor purposes, <br />by the application of interest on the power in- <br />vestment to the roturn of nonpower oosts allocated <br />to be ropain by nower. In doterminin~ rates here- <br />undor thore shall be token into account from time <br />to time actual costs incurred and revenues reali.ed <br />and the Secretory's estimates as to costs yet to <br />bo inourred on authorized ~rojeots ann as to futuro <br />revenues. <br /> <br />(6) That annual appropriations for oporation, main- <br />tenance, and replaoement exponses ohargeable to purposes for <br />whioh allocable construction oosts hove been determined non- <br />reimbursable, includinF fish ann wildlifo conservation, <br />flood control, pollution abatement. reoreation, and sediment <br />oontrol, likewise be troated us nonreimbursable. <br /> <br />30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.