Laserfiche WebLink
<br />. .~ <br />(;J~V' ; <br /> <br />Report of the Regional Director <br /> <br />requirements of the Fedoral Roolamation laws govern- <br />ing the submission to tho Presidont and the Cengress <br />of a finding of engineering feasibility. <br /> <br />(2) The t the wa tor users shall be required to <br />pay only that part of the estimated construction <br />cost Which, in the judgment of the Secretary upon <br />considoration of all appropri~te factors, they should <br />roasonubly be e:;'pected to repay. <br /> <br />(3) That the making of a report and findings <br />pursuant to subseotions (a) and (b) of section 9 <br />of the Rocla:nati.on Project "'ot of 1939 shall not be <br />a condition preoedent to C01Ill1lenCement of construction; <br />but When the ao";ufl.l construction cost of the lJroject <br />is finnlly detelmined, the Socretfl.ry shall report <br />to the Presi~en~ and the Congress showing the aotual <br />oonstruotion co~t, the amount thereof assigned to be <br />repaid by the wnter users as providod in (2) above, <br />the amount theroof allocated to municipal water <br />supply or to o~'er misoellaneous purposes and which <br />probably will b3 returned to the United States, the <br />amount theroof allocated to be returned from power <br />revenues (this including the amount proporty allocable <br />to other purposes but assigned to be returned from <br />power revem.lOs); and the nonreimbursable amounts there- <br />of allocated to i'ish and wildlife conserVDtion, flood <br />control, pollution abatement, reoreation, and sediment <br />oontrol. <br /> <br />" <br /> <br />I. <br /> <br />(4) That the Secretary be authorized and direoted <br />to oonstruct, operate, ane maintain and improvo suoh <br />elootric transmission lines and substations, and facili- <br />ties and struotures appurtenant thereto, as he finns <br />necessary or appropriate for the purposo of transmitting. <br />to existing and potential markets. eloctrio energy avail- <br />able for sale from the prejoct. ano, for the purpose of <br />interohange of energy, to interconneot tho project with <br />other privato or public projeots now or hereafter con- <br />structed. <br /> <br />(5) That. in order to enoourago the widest possible <br />use of electric energy that can be genero.tod an,j marketed <br />and to prevent the monopoli~"tiDn thereof by limited <br />groups. the Secrotary be authorized and directed. <br /> <br />29 <br />