My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11686
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11686
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:18:30 PM
Creation date
10/12/2006 5:06:37 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.150
Description
Grand Valley Unit-Colorado River Basin Salinity Control Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
3/13/1980
Title
Supplement No. 1: Final Report of the Grand Valley Salinity Study - On-Farm Program for Salinity Control
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />o <br />--; <br />(\1 <br />..-t <br /> <br />(.J <br /> <br />--, <br />'4_' <br /> <br />1. Page 45 is hereby modified to include the cost and the downstream effect <br /> <br />of including .off-farm lateral improvements with the onfarm program for <br /> <br />salinity control. <br /> <br />2. Table 17, page 46, is indexed to 1979 dollars and hereby modified to <br /> <br />include $10,900,000 for off-farm laterals in the total cost of installa- <br /> <br />tien, and to include $4,300,000 in dewnstream benefits from 100,000 <br /> <br />tons of salt reduction from improving off-farm laterals. <br /> <br />3. The section of the report titled Irrigation System Improvements, <br /> <br />beginning on page 57, is hereby modified to include improvements in the <br /> <br />off-farm laterals necessary for proper functioning of onfarm <br /> <br />improvement s.. <br /> <br />4. Table 23, page 60, is indexed te 1979 dollars and hereby modified to <br /> <br />include a line item showing the total estimated quantity and cost of <br /> <br />needed improvements in the off-farm laterals. <br /> <br />5. Dellar figures in the next to last paragraph in the section of the <br /> <br />report titled Level of Funding, beginning on page 65, is hereby modified <br /> <br />te be consistent with Table 25 as revised. <br /> <br />6. Table 25, page 66, is indexed to 1979 dollars and hereby modified to <br /> <br />include a line item showing the estimated annual level of funding needed <br /> <br />for the off-farm lateral improvements. <br /> <br />7. Environmental impacts of both onfarm and off-farm improvement measures <br /> <br />to control salinity are discussed in the Environmental Assessment for <br /> <br />the Grand Valley Unit, December 1977, prepared by the Bureau of <br /> <br />Reclamation (now Water and Power Resources Service) and the Soil <br /> <br />Conservatien Service. Impacts attributed to the lateral improvements <br /> <br />will be the same as identified in the assessment. The addition of <br /> <br />selected lateral work under the USDA onfarm program will not alter the <br /> <br />impacts of construction and .operation. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.