My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11680
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11680
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:18:29 PM
Creation date
10/12/2006 5:06:13 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.125.N
Description
San Juan-Chama Project
State
NM
Basin
San Juan/Dolores
Date
12/1/1995
Title
San Juan-Chama Project Monthly Status of Reservoir Storage for Contractors of SJ-C Water for 1995
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />United States Department of the Interior <br /> <br />BUREAU OF RECLAMATION <br /> <br />Albuquerque Projects Office <br />505 Marquette NW. Suite 1313 <br />Albuquerque, New Mexico 87102-2162 <br /> <br />RECEIVED <br />JUN 0 5 1995 <br /> <br />Colorado Water <br />Cons9""'tion Boatd <br /> <br />IN REPLY REFER TO: <br /> <br />JUN 2 1995 <br /> <br />ALB-430 <br />WTR-2.00 <br /> <br />To: All on the Enclosed List <br /> <br />Subject: San Juan-Chama (SJ-C) Project Monthly Status of Reservoir Storage <br />for Contractors of SJ-C Water <br /> <br />Enclosed for your records are tabulations summarizing the status of SJ-C <br />storage in E1 Vado and Abiquiu Reservoirs for all SJ-C contractDrs through the <br />end of April 1995. <br /> <br />During the month of March 1995, an internal transfer of storage took place in <br />Abiquiu Reservoir. At the beginning of each calendar year the Corps of <br />Engineers develops new storage allocations for Sangre De Cristo Water Company, <br />Department of Energy, City of Espanola, and TWining Water and Sanitation <br />District. The allocations typically decrease each year as estimates of <br />sediment deposition in the reservoir decreases the amount of available SJ-C <br />storage for the contractors. As a result of the decrease, the amount of water <br />in storage for each of the contractors exceeded their respective allocation <br />beginning January 1, 1995. An adjustment was made on March 27, 1995 to <br />temporarily transfer the excess water to the City of Albuquerque's (City) pool <br />since they had available space. Each contractor was notified of the transfer <br />and was encouraged to contact Mr. Gary Daves, from the City, to make <br />arrangements if they wished to maintain their water in the City's pool. The <br />transfer amounts are shown on the attached Abiquiu Reservoir table. If no <br />arrangements are made before July 31, 1995, then we will release it as soon as <br />a beneficial use can be found downstream (i.e. in accordance with the enabling <br />legislation for delivery and use of San Juan-Chama water). <br /> <br />If you have any questions, please contact me at (505) 766-1744. <br /> <br />Sincere1~ <br /> <br /> <br /> <br />Karl A. Martin <br />Chief <br />Water Operations Branch <br /> <br /> <br />Enclosures <br /> <br />I:y\'\",-\;",) \\fete.: <br /> <br />R~~"->,,vC:\(' Stcr""y'" ';::'_6lu fD~ 0.1\ 00{ 1'1'15 c..PP'''''''' <br />W"T\" \'Y""mD d.<>-.-t.:cl. 1..\9-'1&. 1"'10-,1,,,,, l,s1- 1.<1.;' a...ls'" <br />b=r- ;",,,-'\d w',R me..mG 0+ Tho:cT J..:o..-te.._ <br />
The URL can be used to link to this page
Your browser does not support the video tag.